Log in
Forum » U.S. and Canada
Topic

Guidance for approaching outdoor swimming pools for a municipal project

LEED v4.1 Discussion Forum
posted by Edward Reifenstein on Jan 5, 2024, 12:58 pm

We are designing a community center and aquatics facility with several outdoor pools. In considering certification options and targets, we are realizong that the pools are major components - both...

Location of outside airflow measuring station inside the HVAC unit

NC-v4 EQp1: Minimum indoor air quality performance
posted by Edgar Arevalo on Jan 4, 2024, 1:15 pm

We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space.  Since there is no recirculating air getting reintroduced to the supply side, the MEP engineer...

Last reply: Edgar Arevalo, Jan 5, 2024, 10:05 am

LEED v4 Heat Island Reduction- include elevator shafts and stairwell enclosures in roof calcs?

NC-v4 SSc5: Heat Island Reduction
posted by Julie Baines on Mar 4, 2022, 6:24 pm

Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO. However, the existing elevator and stair...

Last reply: Julie Baines, Jan 4, 2024, 1:20 pm

Location of outside airflow measuring station inside the HVAC unit

CI-v4 EQp1: Minimum indoor air quality performance
posted by Edgar Arevalo on Jan 4, 2024, 12:31 pm

We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space.  Since there is no recirculating air getting reintroduced to the supply side, the MEP engineer...

Pharmacy Mail Order | Buy Xanax Without Rx- Medz Here Drugstore

SITES Discussion Forum
posted by Benjamin Phelps on Jan 4, 2024, 5:22 am

Xanax is a type of medication used to treat mental health conditions such as anxiety, depression, or panic disorder. Its active ingredient is Alprazolam which gives a feeling of calmness and...

Public park adjacent to the project boundary

NC-v4.1 SSc3: Open space
posted by Eslam Elshorbagy on Dec 20, 2023, 3:57 pm

Hello, 

The project is not meeting the requirements. We only achieved 26% for outdoor space and 15% for vegetated space. Can I use a public park area that shares the same boundary as the...

Last reply: Emily Purcell, Jan 3, 2024, 2:05 pm

LM-83 and spaces greater than 10,000 SF

Pilot-Credits EQpc116: Daylight in nonregularly occupied spaces
posted by Stephanie Graham on Mar 23, 2021, 12:24 pm

Opening a new comment.

Our Project is a large university campus thermal energy plant and the chiller room alone is over 10,000 SF and the largest space in the building.  Our daylight...

Last reply: Collin Robinson, Jan 3, 2024, 10:02 am

One Tenant- two spaces across a public corridor- can this be certified as one project?

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Helen Kessler on Oct 31, 2017, 2:16 pm

The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor.  Seems to me this is no different from a tenant that is on multiple...

Last reply: Dave Hubka, Jan 3, 2024, 8:25 am

EPD Stud- Separate products count towards 20+ goal under 1 EPD

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Allison Para on Dec 29, 2023, 9:56 am

Hello LEED Pros,

I have a letter and an EPD from a manufacturer, and I want to confirm the letters validity regarding how each seperate product counts as 1 product point under the EPD,...

Last reply: Allison Para, Jan 2, 2024, 1:38 pm

100% greenfield site admissibility

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Carla Rincon on Feb 6, 2023, 10:06 am

Hello everyone, 

Can you help me clarify if a 100%...

Last reply: Talia Mamayek, Jan 2, 2024, 11:47 am