Topic | Recent |
---|---|
If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?NC-v4 MRp2: Construction and demolition waste management planningposted by Laura Stanley on Apr 15, 2021, 5:26 pm
Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020? I haven't had any luck finding info for this particular... Last reply: Dave Hubka, Jul 29, 2024, 8:10 am |
|
GHG emissions Factors for LEED v4- 2024 UpdateNC-v4 EAc2: Optimize Energy Performanceposted by Keith Lane on Jul 23, 2024, 9:23 am
Is there a required source to obtain the... Last reply: Marcus Sheffer, Jul 26, 2024, 9:43 am |
|
Do you need to have landscaping in current design to use landscaping water submeter for this credit? & a question about hot H2O.NC-v4 WEc4: Water meteringposted by Glen Boldt on Jul 11, 2023, 2:56 am
Our project is a model and protype shop at a private art and design institution. Our first sub-metered water use will be the electric water heater, which provide 100% of the building hot water.... Last reply: Randy Peters, Jul 23, 2024, 3:27 am |
|
"Less than" VOC content instead of solid VOC valueCI-v4 EQc2: Low-emitting materialsposted by Edgar Arevalo on Jul 22, 2024, 11:06 am
I don't know if anyone has faced this dilemma before, but for me I'm sick and tired of it. Certain manufacturer sites have products with a "less than or <"... Last reply: Edgar Arevalo, Jul 22, 2024, 11:40 am |
|
Sample testing required?Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by on Sep 19, 2023, 12:48 pm
Hello everyone, Looking to understand better the requirements on the Sample testings side for this pilot credit. Do we need to submit an actual testing sample performed, with results? or... Last reply: Kari Botek, Jul 17, 2024, 1:56 pm |
|
Timeline to join for project teamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Christoph Weindl on Sep 25, 2020, 11:27 am
We're pursuing "Social equity within the project team" with Option 2. Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years... Last reply: , Jul 15, 2024, 5:59 pm |
|
"cold in-place recycling" aka "asphalt milling" aka "cold regeneration"NC-v4.1 MRc5: Construction and demolition waste managementposted by Joyce Kelly on Jul 10, 2024, 2:28 pm
This could support this credit and possibly others in the MR and SS categories. Has anyone pursued this within a LEED project? Last reply: Dave Hubka, Jul 10, 2024, 2:52 pm |
|
Grey Infrastructure DevicesNC-v4.1 SSc4: Rainwater managementposted by Jason Cocek on Oct 14, 2021, 11:25 am
The LEED v4.1 guidance says that conventional grey infrastructure devices and hard runoff conveyance systems can be used as a component of... Last reply: Dave Hubka, Jul 10, 2024, 2:19 pm |
|
Are historical sites established prior to the existence of floodplain maps still subject to floodplain compliance?NC-v4 LTc2: Sensitive land protectionposted by Lawrence Rennell on May 10, 2023, 5:54 pmLast reply: Afogreen Build, Jul 4, 2024, 5:55 am |
|
Simplified VRP CalculationsEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Natalia Alvarez on Apr 5, 2021, 8:56 pm
We are working on a building built in the 50's, and the project team has elected to follow LEED Interpretation 10472 - Simplified VRP Calculations. Has anyone submitted a project using this... Last reply: Catarina Costa Goncalves, Jul 3, 2024, 11:20 am |