Topic | Recent |
---|---|
CO Sensors for every Residential Unit as per Minimum IAQ PerformanceNC-v4 EQp1: Minimum indoor air quality performanceposted by Alokmay Behera on Aug 10, 2023, 1:36 am
In one of our Projects with residential spaces, we are required to provided CO sensors for every residential unit. This is a mandatory requirement under the pre-requisite. The same was confirmed... Last reply: Alokmay Behera, Aug 11, 2023, 1:12 am |
|
PRIVATE SHUTTLE FOR A FACTORY LOCATED IN A UPCOMING INDUSTRIAL DEVELOPMENT WITH NON-EXISTANT PUBLIC TRANSPORTATIONNC-v4.1 LTc5: Access to quality transitposted by Amal Venugopal on Jul 27, 2022, 5:13 am
The BD+C, NC project we are applying for is a factory with manufacturing unit and office spaces, located in an developing industrial area with no mutimodel transportation facilities . The... Last reply: Umesh Atre, Aug 2, 2023, 4:16 pm |
|
Minimum Indoor Air Quality Performance CalculationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Amal Venugopal on Jul 4, 2017, 7:27 am
My Project is Having one FAHU on roof which is supplying treated Fresh air to all... Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:16 pm |
|
Data Sheet or Laboratory test report?NC-v4 SSc5: Heat Island Reductionposted by Samer Alhmdan on Jul 20, 2017, 8:46 am
Hello, Do we need a laboratory test report to substantiate the... Last reply: emily reese moody, Feb 9, 2023, 1:17 am |
|
BUS SERVICES PROVIDED BY SCHOOL TO MEET QUALITY TRANSIT REQUIREMENTSchools-NC-v4.1 LTc5: Access to quality transitposted by Amal Venugopal on Nov 3, 2022, 2:20 am
The query is for a school project which is in a location with no bus or any other mode of transporation within LEED proximity range , to meet the Quality transit credit, Opt1. Transit served... Last reply: Stephani Carter, Feb 7, 2023, 12:30 pm |
|
Prefabricated or modular structure BuildingsNC-v4 MPR1: Must be in a permanent location on existing landposted by VISHAL JAIN on Aug 17, 2022, 8:53 am
Hello, Would like to know more details on how "Prefabricated or modular... |
|
Decorative lighting fixturesNC-v4.1 EQc6: Interior lightingposted by Ellis John Mandia on Aug 9, 2022, 6:32 am
Are decorative lighting fixtures such as chandeliers, wall sconces, and table lamps, that are within regularly occupied space included in the requirements to comply with luminance of less than 2,... Last reply: Glenn Heinmiller, Aug 9, 2022, 11:50 am |
|
Advanced Energy Metering Owner & Tenant spacesCS-v4 EAc3: Advanced Energy Meteringposted by Aishwarya Chengappa on Jul 20, 2022, 2:24 am
I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law. Although the owner of the building will be accommodating one of... Last reply: Marcus Sheffer, Jul 22, 2022, 11:17 am |
|
Compliance of Lighting fixturesNC-v4.1 EQc6: Interior lightingposted by Ellis John Mandia on May 23, 2022, 1:52 am
Hello all, Here is a actual problem I have encountered. What will happen if the lighting consultant has provided the necessary documents that comply with all the requirements for the... |
|
Project located on reclaimed landNC-v4 MPR1: Must be in a permanent location on existing landposted by Nermin Hegazy on Nov 28, 2021, 1:03 am
I would like to know what is LEED's take on developing a site which is on reclaimed land. The land for the site is not specifically claimed for the project, it has been reclaimed about 15-20... Last reply: Tristan Roberts, Dec 3, 2021, 1:57 pm |