Forum quick links
Meters on closed-loop hydronic system makeup water
Healthcare-v4 WEc4:Water meteringposted by Mark Benson on
Many healthcare projects have closed-loop hydronic systems for chilled water and heating hot water. Would providing separate meters for chilled water make-up and hot water make-up count as tw
Separate measurement of cold and hot lines for healthcare water uses
Healthcare-v4 WEc4:Water meteringposted by Mark Benson on
For healthcare projects, projects must "install water meters in any five" water uses listed. However, many of these water uses, such as dietary, laundry, laboratory, etc.
Furniture reuse
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Marie Miller on
Hello - I'm working on a TI project and the client is reusing over half their furniture. I know I include this in the calculator, but do I use the value of the furniture when it was purchased?
Do non-contiguous habitat areas qualify?
NC-v4.1 SSc2:Protect or Restore Habitatposted by Jennifer Rennick on
We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible.
Lights mounted under a photovoltaic canopy
CS-v4 SSc6:Light pollution reductionposted by Samuel Calhoun on
Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment?
HPD Disclosure Threshold
NC-v4.1 MRc4:Material Ingredientsposted by Gretchen Krumm on
LEED manual clearly says that an HPD must report ingredients at or above 0.1% for compliance with Option 1.
Monitoring and Corrective action plan
Pilot-Credits SSpc55:Bird collision deterrenceposted by Luis Huertas on
I am working on developing the required monitoring plan, but in conversations with the American Bird Conservation manager, drafting a plan for a new building cannot be drafted in the way the requir
Total Materials Cost vs Total Value of Sustainable Materials Cost
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Chloe Naese on
Hi everyone, I was wondering what the difference is between the "Total Materials Cost" and "Total Value of Sustainable Materials Costs (unweighted)" in the BPDO calculator?