Flush-Out Requirement for a Naturally Ventilated Building
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Eric Carbonnier on
The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.
Regional Priority points not being awarded?
CS-2009 RPc1:Regional Priorityposted by Ashley Love on
I just received our Design Final Review back and we have three credits (WEc3, EAc1, and IEQc7.1) that we have been awarded that are also regional priority credits.
MBCx scope for LEED-CI
CI-v4 EAc1:Enhanced commissioningposted by Mark Benson on
The project scope includes new HVAC equipment & controls as well as occupancy sensors for lighting control.
Green Cleaning in a Fab
NC-2009 IDc1:Innovation in Designposted by David Gibney on
I'm working on a semiconductor fab that is part of a LEED campus project. The campus has a well-established, campus-wide green cleaning program in place.
CO Sensors in Multi-Family Highrise
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jennifer Rennick on
For a Multi-Fam Highrise, the corridors will be heated with a ducted roof-top gas furnace split dx system will be installed.
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?
How to specify for v4 LEED compliance
Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.
SSc4.3 Sign Text
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Steve Valev on
We are working on a community college project which has has an existing parking lot serving the entire campus that already provides enough parking count to cover the parking load of our project. W
Master's Research Survey
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
SSc4.1 Bus Rapid Station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Christopher Widdowson on
Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?