Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Flush-Out Requirement for a Naturally Ventilated Building

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Eric Carbonnier  on 

The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.

1
Thu Mar 19, 2015, 10:43 pm

Regional Priority points not being awarded?

CS-2009 RPc1:Regional Priority
posted by  Ashley Love  on 

I just received our Design Final Review back and we have three credits (WEc3, EAc1, and IEQc7.1) that we have been awarded that are also regional priority credits.

1
Mon Jun 20, 2016, 7:36 pm

MBCx scope for LEED-CI

CI-v4 EAc1:Enhanced commissioning
posted by  Mark Benson  on 

The project scope includes new HVAC equipment & controls as well as occupancy sensors for lighting control.

1
Mon Aug 29, 2016, 10:32 pm

Green Cleaning in a Fab

NC-2009 IDc1:Innovation in Design
posted by  David Gibney  on 

I'm working on a semiconductor fab that is part of a LEED campus project. The campus has a well-established, campus-wide green cleaning program in place.

1
Fri Nov 27, 2015, 9:11 pm

CO Sensors in Multi-Family Highrise

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Jennifer Rennick  on 

For a Multi-Fam Highrise, the corridors will be heated with a ducted roof-top gas furnace split dx system will be installed.

1
Wed Mar 29, 2017, 4:37 pm

Functional entryway of project

CS-v4 LTc5:Access to quality transit
posted by  Martin Stowell  on 

For this credit, 'functional entry of the project' means from the project boundary or the actual building?

1
Tue Jan 17, 2017, 10:18 pm

How to specify for v4 LEED compliance

Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Lissa Spitz  on 

Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.

1
Sat Aug 26, 2017, 11:19 am

SSc4.3 Sign Text

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Steve Valev  on 

We are working on a community college project which has has an existing parking lot serving the entire campus that already provides enough parking count to cover the parking load of our project. W

1
Wed Apr 20, 2016, 2:47 am

Master's Research Survey

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vibha Pai  on 

I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.

0

SSc4.1 Bus Rapid Station

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Christopher Widdowson  on 

Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?

1
Thu Sep 8, 2016, 11:42 pm