Forum quick links
Open Aircraft Hangar, No HVAC
NC-v4 EAc2:Optimize energy performanceposted by Adam Fitzpatrick on
We are designing an open aircraft hangar in southern Alabama that will not have any HVAC equipment. How would we go about pursuing Optimize Energy Performance credits?
MRc1 Option 3
NC-v4 MRc1:Building life-cycle impact reductionposted by Barbara Clarke on
We have the calculations sf for our existing exterior enclosure and areas to be reused (excluding windows). How do we calculate the Exterior structure?
Local utility using green power sources
NC-2009 EAc6:Green powerposted by Emily Purcell on
Curious if anyone has submitted this strategy, successfully or not, or has any other insight - I took over this project after construction documentation was finished so I'm not sure what the thinki
Renewable Energy Generation
ND-v4 GIBc11:Renewable energy productionposted by Jeff Forward on
This credit requires a certain percentage of renewable energy production capacity relative to annual cost.
ID credit purchasing lamps - Copy of a legally binding tenant sales and lease agreement documentation
CS-2009 IDc1:Innovation in Designposted by Edgar Arevalo on
So this statement is concerning, "Please note that since LEED O+M is a whole building rating system, when attempting an Innovation in Design point for following a LEED O+M prerequisite or credi
2016 T24 energy code - v4_Minimum Energy Performance Calculator_v05 - how much of this needs to be completed
CI-v4 EAp2:Minimum energy performanceposted by Kevin Gilleran on
Hi,
Overventilation for Stack Effect
NC-v4 EAp2:Minimum energy performanceposted by on
I'm working on an energy model for a high-rise project in the Pacific NW that has office and residential, with residential being the top two-thirds of the building.
Renewable Energy unable to be commissioned due to delays, can we still submit for LEED review?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rachel Manoguerra on
The project I am working on is "complete" and the owner wants to submit for final LEED review. However, the PV has been delayed and not installed on the project.
Monitoring-based Cx frequency of analysis and approach clarification
NC-v4 EAc1:Enhanced commissioningposted by Kevin Day on
LEED reference manual states "MBCx can be accomplished via systems submetering, operational points trending, and real-time analyses, such as fault detection and sequence verification."