NC-2009 SSc2:Development Density and Community Connectivityposted by Michael Wahjudi on
Hi all, need to get some guidance here. Can ATM considered as "bank"? Since the ATM is having full capability of banking services, except opening bank account.
CO2 SENSOR IN AN UNDERGROUND METRO STATION.
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by VEL MUTHU on
Hello everyone, I am working in a underground metro station which is aiming for LEED certification.
LEED CS 2009 EAc1
CS-2009 EAc1:Optimize Energy Performanceposted by Ruel Galve on
We are currently doing a LEED 2009 CS - GOLD project in Jakarta. The question is: Do we need to select our equipment (pumps and fans) based on the recommended baseline building design power from A
To what extent we provide Tenant fitout
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Indochine Engineering VN on
Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.
Factory Area Classification
NC-2009 IEQc2:Increased Ventilationposted by SAMY Chamy on
We have Projects in Bangladesh 1.It have sewing area, Workspaces in which category we classify it (Ashrae 62.1) 1.Sewing Area 2.Cutting Area 3.Inspection area i need to know what is space type i
OA calculation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hi, I just received the feedback from reviewer. We have AHU to supply 100% OA to the space and FCUs for secondary recirculation.
Power generated in Mini Hydro Power Plant
NC-2009 EAc2:On-Site Renewable Energyposted by Keerthi Ratnayake on
Hi, We have a mini hydro power plant project. Can we accommodate the total power generated in the plant towards this credit? Thanks!
Data Center Baseline HVAC System with Ancillary Office Spaces
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rajesh Balachander on
Hi Marcus Your comments and Suggestions were valuable for my understanding on doing my LEED EM for Data Center. I would like to confirm on my understanding.
Brownfield site but graded before the construction started
NC-2009 SSc3:Brownfield Redevelopmentposted by Michael Wahjudi on
Our site is brownfield (existing navy base), but the site is being graded before 1980 to be prepared as industrial area. The current construction activity start at 2014.
Baseline HVAC system choice
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10 Btu/h ft).