Tenant-level energy simulation
Retail-CI-v4 EAp2:Minimum energy performanceposted by Iqbal Khalilullah on
Dear All,
We wish to clarify on the tenant-level energy simulation for our single floor project located within 40 floors of high rise base-building.
Squat WC using manual flushing
Warehouses-NC-v4 WEp2:Indoor water use reductionposted by Iqbal Khalilullah on
Dear All,
We have 2 nos of squat toilet within the development for the security and driver room. However, the flushing system will be manual using bucket.
LEED Core & Shell building within the LEED ND project
ND-Plan-v4 GIBp1:Certified green buildingposted by Iqbal Khalilullah on
Dear All,
Enhanced Commissioning V4
NC-v4 EAc1:Enhanced commissioningposted by Prakash Sekar on
Can u share the sample submittal document for Enhanced Commissioning V4
How to cal kw/cfm
EBOM-v4.1 EAp3:Energy Performanceposted by Oatto Promsrisawat on
good morning every body as
1. I have input motor on specification 442 Watts (it include power factor or not)
2. I have cfm 1333 cfm
Energy Star Rated Power Value and Computation
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Gene Harn Lim on
We are computing the Energy Star Equipment table and struggle to source the equipment's rated power. A few questions:
Modeling Evaporative cooling systems (ambiator)
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
Hi all, Iam modelling ambiator for a factory building in India. My baseline system is Packaged VAV.
Option 2-Strategy A: Spotlights on a light rail
NC-v4 EQc6:Interior lightingposted by Timothy Ian Middleton on
We have an office project pursuing option 2. Our design is mainly downlighting and spotlights on a lighting rail system.
Option 1: Filtration
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Rodolfo Loro, Jr. on
In Philippines which parameters shall be considered to identify whether an area is non-attainable for PM10 and PM2.5?
Exterior Lighting control for 24x7 operating building
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We have a commercial building which is 24x7 operating.