Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

PU Foam Insulation - Emission Test ISO16000-11

NC-v4 EQc2:Low emitting materials
posted by  Jovelyn Lagunday  on 

General emissions requirements as per LEEDV4 - TVOC's result after 14 days but the information available in accordance with ISO1600 method, TVOC testing results after 28 days.

3
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Tue Feb 23, 2016, 6:49 pm

Process Energy Exceptional Calculation

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Hello, we are considering attempting the exceptional calculation method allowed in Section G2.5 for process load savings on a hospital project: the design is proposing equipment sterilization throu

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Feb 5, 2016, 8:15 pm

Supply fixtures to tenants without installation

CS-2009 WEp1:Water Use Reduction
posted by  Ali Soufan  on 

Would it be possible to claim performance improvement by supplying the toilet fixtures for all tenants without installing them?

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Jan 22, 2016, 4:45 pm

No LEED ND v4 RP credits on LEED website?

ND-v4 RPc1:Regional priority
posted by  Nate Tsang  on 

There are no LEED v4 ND RP credits on the regional priority credit lookup on the USGBC website. Can these projects receive RP credits?

4
Thu Jan 14, 2016, 7:50 pm

EAc5.1 vs EAc5

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Mohammad Haj-Ali  on 

As I understand having read user comments, although the reference guide emphasizes that electricity is to be measured, other energy sources should also be measured just like M&V for new constru

3
Electrical Design Engineer, LEED AP BD+C, REP
Dar Al-Handasah
LEEDuser Basic Member
0 thumbs up
Wed Jan 6, 2016, 3:10 pm

Shuttle bus

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Karim Farah  on 

“ The project (a private factory) is seeking to fulfill the credit requirement of the credit SS Credit 4.1 – Alternative Transportation – Public Transportation access) .

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 5, 2016, 5:13 am

Expected Waste Volume

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Saud Abdul Rasheed  on 

Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.

4
Chief Sustainability Officer
Integral Group
LEEDuser Basic Member
11 thumbs up
Thu Dec 31, 2015, 3:45 am

Anchor Bolt Recycle Content

NC-2009 MRc4:Recycled Content
posted by  Sarfaraj Khan  on 

Hi I have a anchor bolt material and the supplier is saying that the steel is the world most recycle material.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Dec 10, 2015, 3:25 pm

Clarification for Saudi Arabia regional priority credit

NC-2009 MRc2:Construction Waste Management
posted by  Daoud Akeileh  on 

The MRc2: Construction waste management credit is a regional priority credit in UAE one of the Saudi Arabian country eastern boundary and the Saudi Arabia is not one of the listed countries for reg

2
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP
LEEDuser Basic Member
10 thumbs up
Wed Nov 11, 2015, 5:05 pm

IEQc6.1 - space type category

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  S. Sachs  on 

For IEQc6.1-Controlability of Systems-Lighting, Do concourse spaces in a metro station fall into the regularly occupied space category?

3
Thu Nov 5, 2015, 3:21 am