Hello, we are considering attempting the exceptional calculation method allowed in Section G2.5 for process load savings on a hospital project: the design is proposing equipment sterilization through central steam generation using fossil fuel boilers or heat recovery from power generators,
Can we take a baseline case that uses electrical power for sterilization, or it is not allowed that the baseline and proposed case have 2 different energy types?
Thank you