smoke leakage test for duct

NC-2009 EAc3:Enhanced Commissioning
posted by  Abdulla Anwar  on 

Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test? prior to air leakage test since the project specs is giving a small allowable 1% from basis of design?

3
Lead Design Architect | LEED Professional coordinator
Nesma & Partners
LEEDuser Basic Member
0 thumbs up
Mon Feb 27, 2017, 9:11 pm

Baseline Pumping Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Ahmed Labeeb  on 

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mention the effect of pumps' head.

6
LEEDuser Basic Member
4 thumbs up
Fri Feb 10, 2017, 7:22 pm

Embedded Electric Conduits Adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Mario S.  on 

Does cement adhesive for electric PVC conduits that are embedded in concrete walls has VOC content requirements in IEQc4.1? If yes, what is the VOC threshold?

6
Fri Feb 3, 2017, 5:39 pm

Covered bicycle racks for dormitories building in a university

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  soha yamani  on 

I am working on a university campus project which includes over twelve buildings and a dormitories building, now regarding SSC4.2 credit we have provided the required number of bicycle racks for ea

5
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Tue Jan 31, 2017, 6:46 pm

Platted Lots by Government

NC-v4 LTc2:Sensitive land protection
posted by  soha yamani  on 

Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?

3
Senior Sustainability Engineer
Metec Consultants
LEEDuser Basic Member
12 thumbs up
Mon Jan 23, 2017, 8:16 pm

Mosquitos eradicate substance

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Tota Yun  on 

How I can know if this substance which already used by the contractor in new construction project comply with LEED DELTABAZ 25 EC

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 9, 2017, 5:11 am

VOC Content Reporting

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Mario S.  on 

We are working on a LEED project outside the U.S. The datasheets received for the paints and coatings state the VOC content in g/L excluding water as per ISO 11890-2:2006.

2
Tue Dec 20, 2016, 6:57 am

Wood Derived Fuel - Used in Home Fireplace

NC-2009 MRc2:Construction Waste Management
posted by  Mario S.  on 

We are working on a project that generates a lot of scrap wood from formwork.

3
Default Avatar
LEEDuser Basic Member
26 thumbs up
Wed Dec 14, 2016, 12:37 am

A material with zero VOC content

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  dia2000@gmail.com dia2000@gmail.com  on 

Hello, We are submitting data about certain materials that has "zero" VOC content according to manufacturer's datasheet.

4
Wed Sep 7, 2016, 9:19 pm

EAp2

NC-2009 EAp2:Minimum Energy Performance
posted by  sherif el adly  on 

We are working on a huge project in Riyadh, to meet EAp2 we sould look for a water cooled chiller due to the area of the project and the challenge to reach a COP near to 8 to meet the 10% from base

4
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Tue Aug 16, 2016, 3:55 pm