Building Flush-Out Inquiry
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Bolaji Olanrewaju on
I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g.
Terrace Planters
CS-v4.1 SSc2:Protect or Restore Habitatposted by Bret Mantyk on
I'm wondering if terrace plantes are totally out of scope for Protect or Restore Habitat or if there are certain specifications that would allow for terrace planters to count towards the credit.
Greenhouse - Regularly Occupied?
NC-v4 EQc5:Thermal comfortposted by Irene Chung on
I am working on a new university building project pursuing LEED v4 BD+C New Construction, and it includes a greenhouse.
Greenhouse
NC-v4 SSc6:Light pollution reductionposted by Irene Chung on
Does a greenhouse need to be included in the light pollution calculations? (e.g., the vertical illuminances and the percentage of total lumens emitted above horizontal)
Pressure Drop credit for DOAS system in Baseline
Schools-2009 EAp2:Minimum Energy Performanceposted by Manish Khandelwal on
Hi.
20% or more of the design team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Shanwen Hsu on
My project is pursuing option 2
Local Standards Comparisons as Required Documents
NC-v4 SSp1:Construction activity pollution preventionposted by Nate Shroyer on
When working on a project using local standards rather than the 2012 EPA CGP, what is necessary to prove that the local standards are as, if not more, stringent than the CGP. How in depth doe
Water Restoration Certificates Pilot Credit
NC-v4 INc1:Innovationposted by Lissa Spitz on
Hi, can anyone confirm if the volume is supposed to be for the baseline or design annual water use?
thanks!
Indoor Air Quality Assessment
posted by Theresa Scherwitz on
We were planning to achieve Option 2.
v4.1 Tier 1: Onsite Renewable PV Installation
NC-v4.1 EAc5:Renewable Energyposted by Stephanie Graham on
The title of Table 1--"Points for Renewable Energy Procurement" is confusing, as it includes Tier 1. As you indicated under another comment in this credit, it is possible to procur