Quality Views for factories
NC-v4.1 EQc8:Quality Viewsposted by Lise Dannesboe on
Hi - have anyone received points for aulity views for a factory and are a factory subject to the same requirements?
Option 1: Path 1 - High School Census Tract vs Attendance Area
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Kristian Kicinski on
I am working on a high school project located in Seattle. The school serves a predominantly black student population in a historically underserved neighborhood.
CDPH VOC Emissions Certificate Expired
NC-v4 EQc2:Low emitting materialsposted by Peter Doo on
I have a submittal that includes a resinous flooring product for which the CDPH 01350 v1.2-2017 VOC emissions testing certificate expired in September of 2019.
Commitment to Share Data - Military Facility
NC-v4 EAp3:Building-level energy meteringposted by Dane Andersen on
Has anyone worked on LEED certification for a military facility?
eQUEST DOE2.3 for LEED V4 EAp2 and EAc1
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello Everyone,
EQc4 - IAQ Assessment, Option 1. Flush-Out, Path 1. Before Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Theresa Lehman on
If the humidity exceeds the range (higher than 60%) for a couple of hours, can the team simply add those few hours onto the flush-out, or does the flush-out have to start completely over at the tim
building on campus with no smoking policy
CI-v4 EQp2:Environmental tobacco smoke controlposted by Megan Valentine on
We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.
Concrete SR Test Didn't Pass
NC-v4.1 SSc5:Heat Island Reductionposted by Mike Bahr on
We are working on a large project with a significant amount of site paving.
Commercial Interior Project Information - Site Plan
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I'm working on a commercial interior project for LEED v4 rating system. Under the Project Information form, it asks for site plan. What would I provide for a project located on the
Minimum Energy Performance Calculato
Pilot-Credits EApc143:Zero Energy Performance Index (zEPI) ACPposted by Priscillia Champagne on
For the benefit of all :
GBCI Canada Response