Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Partial Floor LEED Certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Edgar Arevalo  on 

I have a project that is a partial floor fit-out where the client would like that partial space to be LEED certified.  The project space is approximately 52% - 60% of the total floor

0

Existing PV on previously certified project

NC-v4 EAc5:Renewable energy production
posted by  Yu Zhang  on 

I have a project that is a new building located on a previous certified LEED project with PV production.  The previous project had >90% offset by energy use and >100% offset by cost from

10
Wed Mar 6, 2024, 5:20 pm

50% surface area reuse

CI-v4.1 MRc2:Interiors Life-Cycle Impact Reduction
posted by  Mark Ragucci  on 

how is this credit calculated? can in include existing floor slab and deck? we are leaving a portion of the exiting walls that are about 20ft tall and our ceilings will be at 9'.

3
Project Architect
Jacobs
LEEDuser Premium Member
0 thumbs up
Wed Mar 6, 2024, 12:34 am

Waste performance yields a score of zero points in ARC

EBOM-v4.1 MRp3:Waste Performance
posted by  jimmy Adames  on 

Hi, Our building is a very automated distribution center for an apparel company.  Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, a

1
Mon Aug 5, 2024, 7:10 pm

Confirmation of Agent's Authority

LEED v4.1 Discussion Forum
posted by  Aaron Kennedy  on 

We are filling out the Confirmation of Agent's Authority.  Does the agent need to be the LEED Accredited Professional or can it be me, the lowly non LEED certified person?  

8
Mon Feb 26, 2024, 10:56 am

Integrative Process Facilitator

NC-v4.1 IPc1:Integrative Process
posted by  Edward Reifenstein  on 

The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Feb 24, 2024, 2:22 pm

Minimum OA Options

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Courtney Mayes  on 

Hello,  I have a site that has a shared OAD for two units.  The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage.  Even with reduced C

1
Sun Feb 25, 2024, 1:14 am