Gerrymandering

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kath Williams  on 

Our project preliminary review points toward gerrymandering the LEED project boundary. It is a golf course clubhouse with geothermal pond on an existing putting green and paths.

0

Fire Suppression water count as a candidate for Submetering?

CS-v4 WEc4:Water metering
posted by  Jennifer Turchin  on 

Can a fire suppression water line be one of the sub metered uses to meet the intent of this credit?

1
Fri Sep 1, 2017, 7:11 pm

Garage/service openings with driveway crossings at sidewalk

Pilot-Credits PC14:Walkable Streets
posted by  Qiongwen Kong  on 

This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.

0

Credit compliance using AVR as an alternative metric

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Zane Lichtneger  on 

I see some formal programs use “average vehicle ridership” (AVR) as an alternate metric. We are active participants with the Go Smart/Go Perks/Triangle Transit/Share The Ride program.

1
Fri Sep 25, 2015, 5:59 pm

Can we use the IEQc4.5 Furniture and Furnishings as an ID credit

NC-2009 IDc1:Innovation in Design
posted by  Carmen Vidal-Hallett  on 

Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.

0

CxA for Enhanced

CI-v4 EAc1:Enhanced commissioning
posted by  Tony Haschke  on 

The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?

1
Fri Jun 24, 2016, 5:06 pm

CFD Model

Healthcare-v2009 IEQc5:Indoor chemical and pollutant source control
posted by  ESD Engineer  on 

I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.

1
Sun Aug 27, 2017, 1:16 pm

Task Lights in Scope

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jonathan Weiss  on 

Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.

1
Mon Nov 30, 2015, 11:56 pm

Sculpture Lighting

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Kristopher Croghan  on 

Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.

1
Thu Aug 11, 2016, 1:37 pm

Phasing Multiple LEED Projects

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sara Zoumbaris  on 

We are working on a development where the project site is composed of two adjacent parcels of land.

0