LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
All LEED projects must meet the size requirements listed below.
LEED BD+C and EB:O&M Rating Systems
The LEED project must include a minimum of 1,000 square feet (93 square meters) of gross floor area.LEED ID+C Rating Systems
The LEED project must include a minimum of 250 square feet (22 square meters) of gross floor area.LEED Neighborhood Development Rating Systems
The LEED project should contain at least two habitable buildings and be no larger than 1500 acres.LEED for Homes Rating Systems
The LEED project must be defined as a “dwelling unit” by all applicable codes. This requirement includes, but is not limited to, the International Residential Code stipulation that a dwelling unit must include “permanent provisions for living, sleeping, eating, cooking, and sanitation.”LEED for Cities and Communities: Existing and LEED for Cities and Communities: Plan and Design
This MPR is not applicable to these rating systems. See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
Can a project with no full-time equivalent occupants (FTEs) be LEED certified?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Where can I get more guidance on occupancy requirements?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
All LEED projects must meet the size requirements listed below.
LEED BD+C and EB:O&M Rating Systems
The LEED project must include a minimum of 1,000 square feet (93 square meters) of gross floor area.LEED ID+C Rating Systems
The LEED project must include a minimum of 250 square feet (22 square meters) of gross floor area.LEED Neighborhood Development Rating Systems
The LEED project should contain at least two habitable buildings and be no larger than 1500 acres.LEED for Homes Rating Systems
The LEED project must be defined as a “dwelling unit” by all applicable codes. This requirement includes, but is not limited to, the International Residential Code stipulation that a dwelling unit must include “permanent provisions for living, sleeping, eating, cooking, and sanitation.”LEED for Cities and Communities: Existing and LEED for Cities and Communities: Plan and Design
This MPR is not applicable to these rating systems.
Can a project with no full-time equivalent occupants (FTEs) be LEED certified?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Where can I get more guidance on occupancy requirements?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |