Do Recycling Rooms need to be Negatively Pressurized?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Nicole Pandolfo on
Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of batteries
Issues & Benefits Log - seeking clarification
NC-v4 EAp1:Fundamental commissioning and verificationposted by Joyce Kelly on
Trying to figure out how the Benefits side of this Log might work.
Drywall replaced on int. non-structural wall
NC-2009 MRc1.2:Building reuse - maintain interior nonstructural elementsposted by Marisa Britton on
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?
Flooring & "categories"
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Flooring & "categories"
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Basement renovation to a LEED Platinum Building
posted by Faith Wilbert on
How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take
Change to Cx agent
NC-v4 EAp1:Fundamental commissioning and verificationposted by Cindy Quinn on
I'm working on a v4 project currently in CD design phase.
Option 2. Third-Party Utility Reporting (1 point)
Homes-v4 EAc5:HVAC Start-up credentialingposted by Robert Grimard on
Hi,
I'll soon be the proud owner of a small house in Quebec, Canada and I need clarification on this Option 2 of th Advanced utility tracking. It says:
ASHRAE Level II Audit qualification
EBOM-v4 EAc1:Existing building commissioning—analysisposted by Alexa Stone on