We have three Core & Shell Buildings on one site. They are pursuing seperate certifications, and because of the small size of the projects, we are not doing a campus or group certification. However, I am thinking there may be grounds to do the calculation for the buildings as a whole. Individually, each building requires 4 long-term racks, 4 short-term racks, and 1 shower. When grouped together they require 4 long-term, 5 short-term, and 1 shower. Is there gorunds do the calculation as a whole?

Thanks!