Recycling not provided for building

CI-v4 MRp1:Storage and collection of recyclables
posted by  Katherine Roth  on 

Requirements state, "Provide dedicated areas accessible to waste haulers and building occupants for the collection and storage of recyclable materials for the entire building." To meet the prerequi

1
Wed May 9, 2018, 8:40 pm

No roof deck?

NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roof
posted by  Michelle Bombeck  on 

On our project, there is no deck, just purlins, insulation and metal roof panels. We'll be reusing the roof and the purlins and likely replacing the insulation.

0

Tracking Waste for Commercial Interiors Project in a Building Still Under Construction

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Loretta Maine  on 

Our LEED project is a Commercial Interior that is in a new building that is still under construction.

1
Sat Jan 20, 2018, 7:27 pm

Utility Bills for REC Green Power Calculations...

NC-2009 EAc6:Green power
posted by  Rick Alfandre  on 

The link below, fromLEEDuser, indicates that if you can use actual utility bills x 50% x 2 yrs to calculate the required quantity of RECs as opposed to the EAc1 energy model design consumption x 35

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Jan 18, 2018, 3:48 pm

Amtrak and Megabus

NC-v4 LTc5:Access to quality transit
posted by  Sara Zoumbaris  on 

Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within walking distance of Amtrak, which has regularly scheduled pickups at our location twice a day.

5
Tue Jan 16, 2018, 6:37 pm

Existing building curtainwall reduced glazing %

NC-v4 EAp2:Minimum energy performance
posted by  Wade Cooper  on 

I have an existing envelope that is a complete curtain wall assembly that is to be replaced.  The overall WWR for the building is over 70% currently and is being removed and redesigned to

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jan 16, 2018, 4:06 pm

Gross area v. net area in PI Form 3 and IEQ8.1

NC-2009 PIf3:Occupant and Usage Data
posted by  James Bell  on 

PI Form 3 requires gross area of Occupied Space.

5
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon Jan 15, 2018, 10:20 am

Owner Provided Signage

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  Summer Minchew  on 

I have a project that will have owner provided signage (naming signage) mounted to architectural canopies.

0

Greencircle certified products

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Vanessa Nelson  on 

Will a Greencircle certified flooring product meet the requirements?

1
Fri Jan 12, 2018, 3:58 pm

Management of on site runoff at a neighboring retention pond

NC-v4 SSc4:Rainwater management
posted by  Jason Garvens  on 

I'm working on a project being built in a designated industrial park area.

1
Thu Jan 11, 2018, 6:49 pm