Forum quick links
Airport terminal - 3 floors, less than 126,000 SF
CI-v4 EAp2:Minimum energy performanceposted by Stacey Olson on
Our system was modeled with a baseline of System 5 - Package VAV w/ Reheat, and is one system per floor.
Lead CxA Representative appointment; Delay causing concerns... Urgent solution required!
NC-v4 EAc1:Enhanced commissioningposted by Olawale Taiwo on
Background Consideration:
Extended Producer Responsibility - Same Producer, Multiple Products
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Gillen on
I have several products that are specified for my project which are from the same manufacturer. For example, the same manufacturer makes the carpet and the laminate flooring.
Product Can Count for both EPD and Material Ingredients?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Yu Zhang on
I am working on a CI project that is going for both MRc3 and MRc5. If a product happen to have EPD and one of the certificates under Material Ingredients credit, can I count it towards the 20
LEED Energy Modeling - Credits EAp2 and EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Andrew Buck on
We are working on a Hotel project in Chicago, Illinois (USA) with LEED NC v2009. Is my understanding correct in that for credit EAp2 you can follow LEED v.4, and for EAc1 you can follow
New LEED CS v4 project adjaent to LEED ND project
CS-v4 LTc1:LEED for Neighborhood Development locationposted by Susan Di Giulio on
We are working on a LEED-CS v4 project which is adjacent to (across the street from) a LEED-ND pilot project certified site by the same owner.
Which Rating System Applies to a small Addition to In-Patient Hospital ?
posted by Margaret Montgomery on
We're beginning a project that includes a 7500 sf ED addition to an existing Emergency Department that will undergo remodeling. The project is part of a recently constructed but not
Temporary reusable wall containment for maintenance and renovations
EBOM-v4 MRp2:Facility maintenance and renovations policyposted by Chris Vickers on
We would like to provide direction to our customers regarding LEED credits with the use of our temporary reusable wall containment system for renovations to protect occupants from dust, debris, and