NEW Non FSC Certified Wood used as Redwood Header installed under the ground outside the building

NC-2009 MRc7:Certified Wood
posted by  Benjie Herrera  on 

Is the NEW Non FSC Wood  Header installed underground outside the building not part of the NEW Wood Baseline in MRC7 Certified Wood?

 

Please advise.

1
Thu Nov 15, 2018, 5:00 am

Diverse Uses: Community Anchor Uses

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Jason Garvens  on 

For the Diverse Uses Option 2 in this credit can a project claim a diverse use by summing up the total FTE's to be >100 for several different commercial offices within a 1/2 mile radius?

5
Sustainable Design Director
Boulder Associates Architects
LEEDuser Premium Member
20 thumbs up
Tue Nov 13, 2018, 3:51 pm

More on UPS s

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Susan Di Giulio  on 

Hi, I understand all the previous discussion UPSs but our situation is just a tad different, The project in question is intensely tech related, and the UPS needed as backup is a 3 phase, 50,000 kV

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:56 pm

Cleanroom Chase Area Classification

NC-v4 EAp2:Minimum energy performance
posted by  Michael Hill  on 

I am wondering if anyone knows if a cleanroom return chase would be counted in the conditioned floor area for determining the primary system type for ASHRAE 90.1.

1
Thu Nov 8, 2018, 8:03 pm

2007 versus 2010 ASHRAE forms

CI-2009 EAp2:Minimum Energy Performance
posted by  Denise Dauplaise  on 

How have others filled in the ASHRAE Lighting Compliance Documentation form, specifically the "Space-by-Space Method" table?

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 7:18 pm

Net Zero Building

CS-2009 EAc6:Green Power
posted by  Lisa Marshall  on 

Hello, my project is going for Net Zero energy consumption and we were planning on going for the EAc6 - Green Power credits.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Nov 8, 2018, 2:44 pm

IAQ testing

Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Danielle Dunn  on 

"One test is required for each separate ventilation system within the building, with not less than one sample per 25,000 ft2 of contiguous floor area."

 

0

alternative energy codes

NC-v4 EAp2:Minimum energy performance
posted by  Alfonzo Collins  on 

I understand the energy model is based on ASHRAE 90.1, but is the LEED project building required to follow ASHRAE 90.1 as the energy code?  Here in NYC, we are allowed to follow either ASHRAE

1
Wed Nov 7, 2018, 4:13 pm

Cooling tower fan power

NC-2009 EAp2:Minimum Energy Performance
posted by  Saif Abdulameer  on 

Hi all, I am modeling a cooling tower the fan meets the requirement of Appendix G, but I am not sure what is the fan power should be used for the baseline, Should I use the same as proposed model

3
Mon Nov 5, 2018, 8:21 pm
2
Director of Sustainability
Leopardo Companies, Inc.
LEEDuser Premium Member
12 thumbs up
Mon Nov 5, 2018, 4:31 pm