Forum quick links
manual control clarification for translucent glazing
NC-v4 EQc7:Daylightposted by Elaine Bright on
The design team wants to know if translucent glazing in clerestory windows would be a manual means of complying with glare control for the daylighting credit requiement for a V4 BD+C
To Parksmart or Not
NC-2009 MPR3:Must use a reasonable site boundaryposted by Kim Shinn on
Our project is a single building - an office building built atop a parking structure. Has anyone done a pro/con analys
Quality Views for Non-Regularly Occupied Spaces
CS-v4 INc1:Innovationposted by Lauren Wallace on
Our project is a cold dark shell restaurant space located in a park location.
Appeal Design Credits during Construction Prelim Review
posted by Danielle Dunn on
I have two credits from my design final review that were denied. However, we would like to submit our credits for construction prelim review.
Genera Emissions Evaluation - Hollow Metal Doors and Frames
CI-v4 EQc2:Low emitting materialsposted by Loretta Maine on
Does Hollow Metal Doors and Frames need to be included in the Low Emitting Materials, Option 1. Product Category Calculations?
C&D Waste Specification Section 017419?
NC-v4 MRp2:Construction and demolition waste management planningposted by Peter Doo on
Does anyone have a C&D Waste Management & Disposal specification section 017419 to share for LEED v4 projects? Thanks!
Can the same material going for Certified Wood Credit also go for IEQ credit 4.4 - Composite Wood and Agrifiber
NC-2009 MRc7:Certified Woodposted by Edgar Arevalo on
So I have one wood material that could go for both, it is confirmed to have no added urea-formaldehyde and is FSC certified. Is it possible to submit the same material for both credits?
Heat Island Effect for Existing Roof to Remain
NC-v4 SSc5:Heat island reductionposted by Allen Cornett on
How do you account for an existing roof greater than 3 years old that will remain? Can the aged values in the manufacturer's literature be used in the calculations?