LEED for Homes with Exterior Energy Uses- Prescriptive
Homes-v4 EAc1:Annual energy useposted by Angela Loughry on
I am working on a home that has significant energy uses not in a HERS rating - exterior pool and snowmelt. I understand that you can go Option 1 under annual energy use. What is unclear
Innovation Credit: Walkable Project Site
CI-v4 INc1:Innovationposted by Patty Lloyd on
The base building achieved this, which was seeking LEED v3 CS. At that time it was pilot credit SSpc14.
LTc5 Quality Transit - is and exemplary performance path avaiable?
CS-v4.1 LTc5:Access to Quality Transitposted by Susan Di Giulio on
We have a LEED-CS project adjacent to a major regional transit hub and it is actually possible that we could double the 360 wkday trips/216 wkend trips required for 6 points.
Option 2 - Is there still a minimum sample area requirement?
NC-v4 EQc4:Indoor air quality assessmentposted by Daniel Smith on
I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.
Renewable Energy production
posted by Ruju Rathod on
We are working on an individual building within a campus. A parking structure will have solar panels.
Can our building apply for points under Renewable Energy Production if,
Reduced Parking Footprint Opt 4 - Unbundling Parking
NC-v4.1 LTc7:Reduced Parking Footprintposted by Rebecca Mann on
New options were introduced in v4.1 for LT Reduced Parking Footprint.
Biophilia and Renovations
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Vanessa Hostick on
Are there any metrics available based on case studies for the pilot credit or related WELL criteria that venues or spaces which renovate using the biophilia concepts rent quicker or have a greater
Emissions Documentation
NC-v4.1 EQc2:Low-Emitting Materialsposted by alix fox on
There are several materials in my calculator for which I have VOC information, but I cannot find a GreenGuard Certificate- are there other resources or documents available to help meet the criteria
LEED-BD+C Hospitality - MRc5 Option 2 for a modular building.
NC-v4 MRc5:Construction and demolition waste managementposted by Susan Di Giulio on
Our project is a hotel for which all guestrooms are being manufactured as modular units. This will certainly save waste, and we are interested in pursuing Option 2.