Forum quick links
How to Model OA if the Outdoor unit selected is bigger than Min OA
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
Modeling Baseline system for an Aquatic center
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am modeling an aquatic center for LEED V4, with the floor having radiant heating , what should be the baseline system for radiant heating for floors in baseline?
Adhesive & Sealants: VOC Content 0 g/L VOC Emissions ?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Alyssa Scharf on
There is an adhesive that the manufacturer claims is 0 g/L of VOC content. I cannot locate emissions data for said product and project teams members are trying to make the argument that the e
Baseline and Proposed Constructions for a building constructed in 1970 for ID+C Project
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
Interior cross contamination prevention out of scope-CI
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Casey Cullen-Woods on
I am working on a commercial interior fit out project that would like to pursue this credit. The base building has entryway systems and MERV filtration on outdoor handling units.
STC requirement for a Retail area next to a hallway in a medical building
NC-v4 EQc9:Acoustic performanceposted by Todd Bundren on
We are working on a new medical buidling (cancer center) and there is a gift shop off a large corridor close to the main entry.
Help needed with ARC platform
EBOM-v4 MPR1:Must be in a permanent location on existing landposted by Antonio de Sousa Filho on
Hi everyone,
Energy Performance on Air Structured Dome
NC-v4.1 EAp2:Minimum Energy Performanceposted by Thomas Jangaard on
Hello,
LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?
NC-v4 EAc1:Enhanced commissioningposted by Theresa Lehman on
Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope commissioning, where the hired BECx simply "observes" the
Quality Views Analysis Results is AutoCase
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Mansoureh Jalali on
When I try to add my Views study results to AutoCase it asks for the type of view for both baseline and proposed design.