Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Landscaping near the facade

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Michelle Halle Stern  on 

One of my teammates has raised a concern that we aren't eligible for this credit if plantings are located near the facade. I don't see any mention of that requirement in the credit language.

1
Tue Mar 9, 2021, 6:32 pm

Education Session/Survey Requirement in LEED v4 Projects

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Brad Newkirk  on 

I am working on a LEED-CI v4 project that has registered for this Pilot Credit.

For submittal requirements in the USGBC Pilot Credit Library it lists that projects will need to provide:

3
Managing Member
Emerald Built Environments
LEEDuser Basic Member
0 thumbs up
Tue Mar 2, 2021, 6:38 pm

LEED Innovation: WELL Features

NC-v4 INc1:Innovation
posted by  Dola Onajin  on 

1. Was LEED Innovation: WELL Features ever a pilot credit? If so, when and under what version?
2. When did it become an innovation credit?

0

General Emissions Evaluation criteria for flooring assemblies assembled off-site

NC-v4 EQc2:Low-emitting materials
posted by  Jeff Wiedmeyer  on 

I've read through the posts related to this subject but for laminating adhesives and millwork.  My question is similar but pertains to the requirement for a flooring assembly assembled off sit

2
Fri Feb 26, 2021, 12:57 am

LEED v4 credit coach?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Lawrence Rennell  on 

I have heard that there is credit coaching available for LEED v4 credits, however, finding a way to contact this individual is on the same level as making contact with Bigfoot.

4
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Tue Feb 23, 2021, 9:23 pm

Safety First Pilot Credits - Additional Innovation Points

Working through COVID-19
posted by  Cynthia Kaplan  on 

We have a project that has already claimed 4 of the 5 innovation points available. We would like to utilize at least 2 of the Safety First pilot credits.

3
Mon Feb 22, 2021, 11:31 pm

Default contract length for renewable energy procurement

NC-v4.1 EAc5:Renewable Energy
posted by  Bryna Dunn  on 

Under the definitions of Tier 1, Tier 2, and Tier 3, there is a statement that reads: "The default contract length for renewable energy procurement is 10 years.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Feb 19, 2021, 2:39 pm

Partial "Lumens above Horizontal" calculation

NC-v4 SSc6:Light pollution reduction
posted by  Jack Ma  on 

Anyone have experience documenting an uplight light fixture with a permanent structure above for “partial lumens above horizontal” calculation, please let me know

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Feb 18, 2021, 8:54 pm