Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Prevention through Design
NC-v4 INc1:Innovationposted by FUTING LI on
For projects located in China, can local national safety standards be used as an equivalent alternative to OSHA standards for this credit?
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing this pilot credit.
Is a TVOC emissions evaluation for an epoxy flooring system's topcoat acceptable?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Lutfi-Hisham Muhammed on
We are managing the new construction of a pharmaceutical production facility where we have an epoxy flooring system to be installed which consists of a primer, application of the main product (prod
Whole Project Water Use Reduction
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Mo Chesh on
This is the first time I have implemented this pilot credit/ACP.
Multiple Exterior Wall Finishes
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by José Tamez on
For projects with multiple exterior wall finishes, how do you usually decide which wall areas to include in the Cool Walls calculations?
4 Buildings and 1 maintenance building excluded
NC-v4 EQc4:Indoor air quality assessmentposted by Summer Gorder on
There are 4 biuldings being LEED certified, and one maintenance building. We did not include the maintenance building, but it is being questioned.
Common comments in review phase
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Diana Rueda on
Were there any common reviewer comments or documentation challenges that I should be aware of before submission?