Topic | Recent |
---|---|
LEED EB or NC?LEED Rating System Selectionposted by Elke Malleier on May 28, 2013, 7:51 pm
We are building a considerable extension with new production lines to an existing manufacturing plant built in 1984, that has no LEED certification. The client wants to apply for a LEED... Last reply: Susan Walter, Jun 18, 2013, 8:48 am |
|
LEED CI applicabilityLEED Rating System Selectionposted by Esther Izquierdo on Jun 11, 2013, 9:02 am
Hi, I am working on a commercial project where the new owner is planning a fit-out renewal. The owner will occupy 90% of the space, with 10% being sub-let. The fit-out will occur in the... Last reply: Tristan Roberts, Jun 18, 2013, 8:40 am |
|
Certification- Factory BuildingLEED Rating System Selectionposted by Nowfal Kunju Muhammed on May 13, 2013, 4:00 am
Is it possible to certify an unconditioned factory building (only lighting load)? Last reply: Tristan Roberts, May 15, 2013, 9:20 pm |
|
LEED CI and EBOM and transfer after building is soldLEED Rating System Selectionposted by Todd Bundren on May 15, 2013, 5:38 pm
Does the LEED CI and / or... Last reply: Tristan Roberts, May 15, 2013, 9:19 pm |
|
NC-v2.2 certified project- How to certify a large new additionLEED Rating System Selectionposted by Michelle Bombeck on May 3, 2013, 4:10 pm
We have a NCv2.2 certified building that is now constructing an addition. This addition was planned years ago and was registered as an NCv2.2 project but was then put on hold. The project has... Last reply: Tristan Roberts, May 9, 2013, 12:25 pm |
|
Cabins at a summer camp?LEED Rating System Selectionposted by Patty Breech on Apr 30, 2013, 4:18 pm
I have a unique project that involves building 5 stand-alone cabins as part of a summer camp. They're meant to house the full-time staff, so they're residential in nature, but lack things like... Last reply: Tristan Roberts, Apr 30, 2013, 6:03 pm |
|
leed cs or leed retail?LEED Rating System Selectionposted by shashank jain on Apr 24, 2013, 9:20 am
For the Retail projects, specifically shopping malls, where developer aims to sublet all retail units to prospective tenants and effectively will not have the control over their fit-out, or a... Last reply: Tristan Roberts, Apr 24, 2013, 9:23 am |
|
LEED Homes vs LEED NC for Dormitory with Faculty ApartmentsLEED Rating System Selectionposted by Timothy Casper on Apr 18, 2013, 5:24 pm
I am working on a dormitory building at a boarding school that will also include faculty apartments. The student dorms will be comprised of single and double bedrooms. There will be shared... Last reply: Tristan Roberts, Apr 18, 2013, 9:28 pm |
|
Change of rating systemLEED Rating System Selectionposted by Lolita Wu on Apr 16, 2013, 3:43 am
Dear all Last reply: Tristan Roberts, Apr 16, 2013, 8:55 am |
|
Leed Rating system- multiple buildingsLEED Rating System Selectionposted by Kevin Perry on Apr 9, 2013, 2:06 pm
Hello, We are working on a project for a privately funded college on a single site, in existing multiple buildings. There are 6 buildings on this site, 1 of these buildings will be occupied by... Last reply: Kevin Perry, Apr 10, 2013, 12:02 pm |