Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Emergency Showers and Bicycle Facilities

CI-v4 LTc4:Bicycle facilities
posted by  Crista Shopis  on 

Could emergency showers included in a Lab project meet the requirements for Bicycle Facilities credit?

0

Used AutoCASE software to achieve this credit

Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysis
posted by  Megan Leslie  on 

I am using AutoCASE software to pursue the Informing Design Using Triple Bottom Line Analysis Pilot Credit as well as this Pilot Credit.  It is interesting to see the results of the report.&nb

17
Mon May 11, 2026, 9:29 pm

LEED v5 Pilot Credits

EBOM-v5 PRc1:Project Priorities
posted by  Srecko Curkovic  on 

Does anyone have more information on pilot credit registration requirements for LEED v5? Thank you!

0

IEQc4.1 Required information

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Victoria Rios Esteve  on 

Hi everyone! 

I´m pretty new at LEED certification process, so I will really appreciate your help. 

3
Mon May 11, 2026, 4:37 pm

Embedded Grout Applications - VOC Requirements

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Faran Arshad Chohan  on 

If a grout product is being used within concrete/foundation works (non-finish application), where the material will be fully embedded and not exposed to occupied indoor spaces or interior air durin

1
Mon May 11, 2026, 4:36 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2:Low-emitting materials
posted by  Edgar Arevalo  on 

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor,

11
Mon May 11, 2026, 4:09 pm

Clarification on LEED Low-Emitting Materials Applicability for Concrete Curing Compounds

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Faran Arshad Chohan  on 

We would appreciate clarification regarding the applicability of LEED v4/v4.1 Low-Emitting Materials requirements for concrete curing compounds used as part of cast-in-place concrete works.

1
Mon May 11, 2026, 12:29 pm

What is the Process for BIS CRS Registration?

LEED Exam Discussion
posted by  Bl India  on 

BIS CRS Registration is required for many electronic and IT products before they can be marketed in India.

0

Above ground storage tanks

NC-v4 LTc3:High priority site
posted by  Samuel Calhoun  on 

A project I am working on had (QTY: 27) above ground storage tanks removed from the site. This work was overseen by a 3rd party consultant, permitted by the local AHJ, and registered with the DEP.

0