Topic | Recent |
---|---|
Purchasing- Lamps with UV-CNC-v4 INc1: Innovationposted by on Aug 1, 2023, 1:50 pm
Does anyone know if the Purchasing - Lamps innovation credit requires reporting of UV-C lights in air handlers (for coil irradiation and virus mitigation)? If so, what is the equivalent pg HG... Last reply: Edgar Arevalo, Feb 5, 2024, 3:11 pm |
|
Concern regarding entryway systemsEBOM-v4.1 EQc1: Green Cleaningposted by Wafa Arif on Jan 25, 2024, 4:01 am
Hello, Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel. In our hotel project, the double door entrances leave no space... Last reply: Stephen Ashkin, Feb 5, 2024, 1:33 pm |
|
beyond the 25 feet boundary and neighboring businessCI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Dec 6, 2023, 4:10 pm
There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance. The thing is it is next to neighboring business that are are within the 100 feet and... Last reply: Edgar Arevalo, Feb 5, 2024, 11:44 am |
|
Credits Applicable for Product-Services?EBOM-v4.1 MRc1: Purchasingposted by Marieke Head on Feb 5, 2024, 8:45 am
My client owns a product-service company that makes (charged) rechargeable batteries available to their clients on a subscription model, whereby my client maintains ownership of the batteries.... |
|
Leak detection based on water meterPilot-Credits WEpc153: Water Leak Detection and Monitoringposted by Michaël Briffaz on Feb 5, 2024, 8:47 am
Hey, The credit languages is stating to "Install water sensors connected to a local network internet BMS or metering solution on water using subsystems." Would it be ok to... |
|
Parksmart measuresNC-v4 INc1: Innovationposted by Norbert Szircsak on Jul 17, 2019, 4:57 am
Dear All, The innovation strategy 1 under Innovation: Parksmart Measures looks a good fit for our project, and I think generally for many projects. However from the wording of the... Last reply: Michaël Briffaz, Feb 5, 2024, 8:37 am |
|
Is string lighting exempt from the Light Trespass/Uplight requirements.NC-v4 SSc6: Light Pollution Reductionposted by Summer Gorder on Feb 2, 2024, 7:04 pm
Hi, we have a project where they are using string lighting to light a pathway. Is string lighting exempt from the Light Trespass/Uplight requirements due to the low wattage based on ASHRAE or... Last reply: Glenn Heinmiller, Feb 3, 2024, 4:37 pm |
|
How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use > 20%?Warehouses-NC-v4 WEp2: Indoor water use reductionposted by Blake Jackson on Dec 1, 2023, 2:44 pm
I'm working on a 455,000gsf expansion of an existing warehouse/stroage facility. The existing facility won't be renovated, spare for the demolition of an existing exterior wall to provide... Last reply: emily reese moody, Feb 3, 2024, 1:22 pm |
|
Initial Water StorageNC-v4 SSc1: Site assessmentposted by JIm Rozema on Aug 24, 2018, 11:38 am
Can you provide the definition of the Estimated TR-55 Initial Water Storage? This term is not defined in TR-55. Last reply: Thomas Lagarde, Feb 2, 2024, 5:50 pm |
|
Does type of signage matter?CI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Feb 2, 2024, 5:13 pm
Does it matter the type of signage that's displayed at the entries of the building? I have a contractor who placed a paper sign behind the glass door of the main entrance, which clearly states... |