Commissioning DES if waste heat is recovered from process

NC-2009 EAc3:Enhanced Commissioning
posted by  Dave Hubka  on 

Our project includes an existing (more than three years old) DES that serves both the process equipment and building htg/clg loads.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue May 26, 2015, 9:40 pm

Baseline HVAC system choice

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10 Btu/h ft).

5
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue May 26, 2015, 3:02 pm

G3.1.1 Exception for system 3

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a college building with around 50% of its floor area being a gym, which is sized to its maximum capacity during graduation.

3
Tue May 26, 2015, 1:51 pm

Chiller IPLV

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

I have a query on ASHRAE 90.1 2010. There are 2 paths to specify the chiller COP. How do we enter the part load values in the simulation software? ASHRAE only mentions the IPLV.

5
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Mon May 25, 2015, 6:24 am

Can I lock the credits not to be touched by other team members ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Is there any feature in LEED online to lock the credits not to be changed by other team members ?

2
Default Avatar
LEEDuser Expert
472 thumbs up
Sun May 24, 2015, 10:27 pm

Cleaners

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Pia Öhrling  on 

Should a cleaner used before the adhesive (to make the Surface clean) fullfill IEQc4.1? If it should which category should be used?

2
Sat May 23, 2015, 12:29 am

Filed (2)exemp. performance credit under (1) ID in case one fail

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Hi, I filed two exemplary performance credit under the same Innovation in design in case one fails.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 6:52 pm

Lead Paint

Schools-2009 SSp2:Environmental Site Assessment
posted by  Adam Musante  on 

Generally speaking, is the presence of lead paint in an existing school from the 1950's cause for concern and must be addressed or else the prerequisite is not satisfied?

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Fri May 22, 2015, 5:45 pm

Can I defer any ID credit to submit it w/ construction package ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 1:23 pm

Where do I upload the response report for Design Final Package ?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri May 22, 2015, 1:22 pm