Forum quick links
Commissioning DES if waste heat is recovered from process
NC-2009 EAc3:Enhanced Commissioningposted by Dave Hubka on
Our project includes an existing (more than three years old) DES that serves both the process equipment and building htg/clg loads.
Baseline HVAC system choice
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10 Btu/h ft).
G3.1.1 Exception for system 3
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a college building with around 50% of its floor area being a gym, which is sized to its maximum capacity during graduation.
Chiller IPLV
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
I have a query on ASHRAE 90.1 2010. There are 2 paths to specify the chiller COP. How do we enter the part load values in the simulation software? ASHRAE only mentions the IPLV.
Can I lock the credits not to be touched by other team members ?
posted by Matt Dem on
Is there any feature in LEED online to lock the credits not to be changed by other team members ?
Cleaners
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Pia Öhrling on
Should a cleaner used before the adhesive (to make the Surface clean) fullfill IEQc4.1? If it should which category should be used?
Filed (2)exemp. performance credit under (1) ID in case one fail
posted by Matt Dem on
Hi, I filed two exemplary performance credit under the same Innovation in design in case one fails.
Lead Paint
Schools-2009 SSp2:Environmental Site Assessmentposted by Adam Musante on
Generally speaking, is the presence of lead paint in an existing school from the 1950's cause for concern and must be addressed or else the prerequisite is not satisfied?
Can I defer any ID credit to submit it w/ construction package ?
posted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
posted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.