Is there any guideline to the sampling criteria such as the measurement interval during the normal occupied hours? In Hong Kong the sampling period required by Env. Dept is on 8-hour basis with an average of half-hour measurements conducted at 4 time-slots. I wonder if this can fulfill the criteria of LEED. Thanks!