Log in
Forum » Credit Forums
Topic

Building footprint vs. hardscape

CS-2009 SSc7.1: Heat island effect - nonroof
posted by Erica Downs on Mar 28, 2011, 2:10 pm

Would entry stairs to the building be considered part of the building footprint, or part of the site hardscape? Thanks.

Last reply: Tristan Roberts, Apr 22, 2011, 6:44 pm

LEED CI in a LEED CS building- WE

CI-2009 WEc1: Water Use Reduction
posted by Susan M. Kaplan on Mar 29, 2011, 10:31 am

We are going for LEED CI v2009 in a LEED CS v2009 building. Both are in design. Our client (LEED CI) will be in more than 75% of the building. There are no restrooms in our tenant fit-out (...

Last reply: Tristan Roberts, Apr 22, 2011, 6:34 pm

Please, How to calculate the

CS-2009 EAc4: Enhanced Refrigerant Management
posted by Joaquim Lima on Apr 13, 2011, 4:52 pm

Please,

How to calculate the Refrigerant Charge??

Thanks!

Last reply: Tristan Roberts, Apr 22, 2011, 6:29 pm

Multiple HVAC Zone Controls- Credit towards Individual Comfort?

CI-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Simon Sue on Apr 11, 2011, 10:17 pm

In a current commerical office project, we are considering the following thermal controls:

-Individual thermostats for each private office or meeting room
-One open office space with...

Last reply: Lauren Sparandara, Apr 22, 2011, 6:29 pm

Interior Project inside a complex CS

CI-2009 SSc3.3: Alternative transportation - parking availability
posted by Paola Figueiredo, Newton Figueiredo on Apr 14, 2011, 4:36 pm

We have a project inside of one tower that have like common area the parking spaces. However, this tower have a certification LEED and yours parking spaces makes part of complex (AGMBC). The...

Last reply: Tristan Roberts, Apr 22, 2011, 6:23 pm

Base building fixtures meet old LEED 2.0, but not LEED CI 2009

CI-2009 WEc1: Water Use Reduction
posted by Sandra Eremic on Apr 7, 2011, 6:16 pm

Our project occupies (4) out of (10) floors of a building which was LEED 2.0 certified. We are attempting Silver under LEED CI 2009. If we are only counting fixtures in our scope of work, we...

Last reply: Tristan Roberts, Apr 22, 2011, 6:22 pm

How to treat reuse furniture in the calculation for FSC wood

CI-2009 MRc7: Certified Wood
posted by Steve Khouw on Apr 11, 2011, 2:45 am

In a LEED project, we want to...

Last reply: Tristan Roberts, Apr 22, 2011, 6:08 pm

lighting space by space

CI-2009 EAp2: Minimum Energy Performance
posted by Billy Ng on Apr 22, 2011, 2:07 am

under ASHRAE Table 9--6, there is a space type as bank/office - banking activtiy area. how to justify this?
I have an i-bank office fitout project. can i use that for my lighting in my...

Last reply: Tristan Roberts, Apr 22, 2011, 5:58 pm

Regularly Occupied Spaces

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Paola Figueiredo, Newton Figueiredo on Mar 28, 2011, 6:11 pm

Hello. I have a typical room in this CI project, that is used in a sporadic period during the day. In this room we have five workstation, but as i said, used about 1 hour per day. So can I...

Last reply: Tristan Roberts, Apr 22, 2011, 5:45 pm

ID Kiosk

NC-2009 IDc1: Innovation in Design
posted by Joseph Blanco on Mar 29, 2011, 3:28 pm

If our project puts a Kiosk in the lobby showing a video of all the sustianable attributes of our project in addition to placing signs through out the building, would that count as two ID credits...

Last reply: Jonathan Weiss, Apr 22, 2011, 9:43 am