Forum quick links
Experience Feedback for Biophilia
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Maddie Spinski on
In our early childhood education center, the large outdoor play space is supplemented with a separate support building that provides additional opportunity for children to experience the connection
Does Declare count as Third-Party Verified in LEED v4.1?
NC-v4.1 MRc4:Material Ingredientsposted by Adam Stoker on
The following credit language introduced in LEED v4.1 leaves me with some questions regarding Declare labels:
Off Gassing
posted by Darryl Chrenek on
If we had to use a subfloor adhesive that was 160gl and not our normal 100gl that is followed by 3 layers of materials(plywood, underlayment and marmollium flooring) how long would it need to off g
Adding points from different Tiers?
NC-v4.1 EAc5:Renewable Energyposted by Kimberly Reddin on
Hopefully this is an easy one, I just want to be sure I'm reading this credit correctly. The credit language says “points achieved in each category may be added for a total of 5 point
Compromise between Dust Control by Watering & Water Consumption
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Abdulrahman Sherazy on
The best way I experienced in dust control measures in construction roads is to cover these roads by crushed stone, compact it by the compactor, and finally water it frequently.
LZ3- Glare exemption
NC-v4 SSc6:Light pollution reductionposted by Madhura Dhayagude on
Hello,
I have a question regarding glare ratings for open air showrooms.
Non Regularly Occupied Spaces
CS-v4.1 EQc4:Daylightposted by Mitra Sajjadi on
I have a quick question. Are phone rooms/focus rooms non regularly occupied spaces? I could not find that in the chart and I wanted to make sure my assumption is correct.
JEDI & Hiring
posted by Seonhee Kim on
Our firm is looking into our hiring process with JEDI objectives and looking for examples that have been successful.
LEED Interpretation 10471
CI-v4 IPc1:Integrative processposted by Dave Hubka on
I just learned from a LEED review report that owner's renovating their own space must "identify one or more viable locations, undertake the comparison outlined in Site Selection requirements, and c