v2009 - SSc1: Site Selection - Wetland Protection
NC-2009 SSc1:Site Selectionposted by Kathy Hrabovsky on
Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing wetland if the project site is 60', instead of 100', from a wetlan
What Credits Require a Performance Period
posted by Divantha Ekanayake on
Dear All,
When to hire a Commissioning Agent
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Davis on
We were alerted to this project in Design Development Phase and the next phase has been progressing while we have been hiring and negotiating with the prospective CxA.
Forum Participation Requirement
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Michelle Rosenberger on
I appreciate the idea behind making forum participation part of the requirements for pilot achievement.
Uplight - lumens emitted above horizontal
NC-v4 SSc6:Light pollution reductionposted by Amanda Cunningham on
Can anyone clarify if the maximum allowed percentage of total lumens emitted above horizontal (by lighting zone) is applied to each individual luminaire or the sum of all lumens from all luminaires
Reflectance
NC-v4 EQc6:Interior lightingposted by Inês Marques on
Hi guys, I'm having troubles getting datasheets with reflectance values for the project I'm working on.
Heating coil as a preheat in DOAS with VRV
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone
I am quite confused because I got a review comment recently where Reviewer suggests to exclude preheat coils from Baseline System 7.
Where to look for manufacturer documentation
NC-v4 EQc2:Low emitting materialsposted by Lissa Spitz on
Is it just me? I'm having a hard time finding manufacturer documentation that confirms compliance with CDPH, aqBB, etc.
How to model a warehouse without HVAC system ?
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Azfar Mohamed on
Hello everyone,
LEED Basement Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.