Forum discussion

Warehouses-NC-v4 MRc1:Building life-cycle impact reduction

Addition to existing building

Hello,

For the project located in Spain, I would like to use Option 4. Initially, it was supposed to be a single warehouse, but later the design has changed, and it will be a new addition to existing building.

As per manual:  "Option 4 is for entirely new buildings but can also be used by projects that are new additions to
existing buildings; it involves conducting a life-cycle assessment for the whole building."

The gross floor area of the baseline and proposed buildings must be the same. As proposed building should I include an existing building with addition, and for the baseline buidling (under conidion the same gross area) also exisitng building plus initial design which was a single warehouse?

Thank you

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.