CalibrationEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Gustavo De las Heras Izquierdo on Apr 17, 2017, 1:17 pm
Hallo, According to the BMS and HVAC subcontractor, the sensors do not need to be calibrated, particularly CO sensors and chilled water temperature sensors. For... Last reply: Ben Stanley, Aug 29, 2017, 11:45 am |
|
LEED V3 Vs V4EBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by VISHESH AGARWAL on Jun 3, 2016, 3:15 am
Advanced energy metering: Last reply: Dave Hubka, Jun 3, 2016, 4:50 pm |
|
Tenant submeteringEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Gustavo De las Heras Izquierdo on Apr 26, 2016, 1:40 pm
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”. I would like to confirm that tenant submetering does not need to be... Last reply: Melissa Kelly, May 2, 2016, 1:59 pm |
|
Subsystem or End Use TypeEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Ran Zhang on Nov 29, 2013, 4:03 am
On page 200 of the LEED-EB reference guide, Table 1- Sample Summary of Energy and Metering Capacity lists major energy-consumption subsystems and end-uses. My question is which system the energy... Last reply: Ben Stanley, Jan 25, 2016, 4:52 pm |
|
How to define categoriesEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Noriko Nagazumi on Jun 20, 2014, 7:00 am
Hello there, There is a sample summary of energy and metering capacity on page 200 of the reference guide, and some explanation on "Energy Use Breakdown" on page 198 saying that... Last reply: Ben Stanley, Jan 25, 2016, 4:46 pm |
|
measuring heat pump load for system submeteringEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by ethan adams on Jun 2, 2015, 8:22 am
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one. Each of the top 2 floors has an electrical panel... Last reply: Melissa Kelly, Nov 30, 2015, 3:16 pm |
|
Occupancy in the buildingEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Alberto Cardenas on Jul 20, 2015, 10:27 am
My question is if the occupancy of the building is a single person in this case of an institution and has no tenants can apply for this credit. Last reply: Melissa Kelly, Nov 30, 2015, 3:09 pm |
|
Performance period durationEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Charalampos Giannikopoulos on Sep 8, 2015, 9:09 am
The LEED Online form requests that “monthly and annual summaries of the metered energy usage for each of the subsystems”. Does this mean that a performance period of 12 months is mandatory as a... Last reply: Melissa Kelly, Nov 30, 2015, 3:05 pm |
|
Gas meteringEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Oana Stamatin on Feb 20, 2014, 10:07 am
In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant). The project... Last reply: Magda Aghababyan, Apr 9, 2014, 6:40 am |
|
Minimum Performance Measuring TimeEBOM-2009 EAc3.2: Performance measurement - system-level meteringposted by Marina Andrade on Dec 5, 2013, 12:22 pm
Greetings, We have a doubt about the credit EA C3.2 from LEED EB O&M. What is the minimum time to measure performance of the major’s building systems by the breakdown of energy? Do we... Last reply: Hannah Bronfman, Feb 17, 2014, 2:39 pm |