Solar Panel Energy SavingsNC-2009 EAc2: On-Site Renewable Energyposted by DILIP bussa on Aug 5, 2015, 10:28 am
hello Marcus, i am currently designing a navy lodge and it is 66,420 sq ft.its a Four floor building with 12 guestrooms on each floor about 900 sq. ft each. we have solar panels... Last reply: Marcus Sheffer, Aug 5, 2015, 10:41 am |
|
Building TypeNC-2009 EAc2: On-Site Renewable Energyposted by Geraldine Assmus on Jul 2, 2015, 2:07 pm
I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit. I came across a crossroad regarding the Building... Last reply: Marcus Sheffer, Jul 3, 2015, 11:10 am |
|
Power generated in Mini Hydro Power PlantNC-2009 EAc2: On-Site Renewable Energyposted by Keerthi Ratnayake on Jun 1, 2015, 7:44 am
Hi, We have a mini hydro power plant project. Can we accommodate the total power generated in the plant towards this credit? Thanks! Last reply: Marcus Sheffer, Jun 16, 2015, 2:39 pm |
|
Elegible On-Site Energy SystemsNC-2009 EAc2: On-Site Renewable Energyposted by Paula Hernandez on May 27, 2015, 12:18 pm
What is exactly a "Low-impact hydroelectric power systems" and how do we demonstrate that it is low-impact. Last reply: Paula Hernandez, May 28, 2015, 4:44 pm |
|
Clarification on Solar Hot Water system eligibilityNC-2009 EAc2: On-Site Renewable Energyposted by Sasha Peters on Apr 20, 2015, 3:56 am
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.... Last reply: Marcus Sheffer, Apr 20, 2015, 11:17 am |
|
Annual Energy CostNC-2009 EAc2: On-Site Renewable Energyposted by Sarah Thompson on Feb 18, 2015, 5:00 pm
I am trying to figure out which cost to put in here. Another post said it was savings, although I can't find anything under the credit intent or resources for this specific item. Last reply: Marcus Sheffer, Feb 18, 2015, 5:30 pm |
|
Solar PV System DegradationNC-2009 EAc2: On-Site Renewable Energyposted by Katherine Ann Resurreccion on Feb 10, 2015, 1:45 am
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year. The... Last reply: Marcus Sheffer, Feb 10, 2015, 8:41 am |
|
Pre-existing Campus PV Array- Does commissioning apply?NC-2009 EAc2: On-Site Renewable Energyposted by Heather DeGrella on Sep 19, 2014, 4:25 pm
If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do... Last reply: Heather DeGrella, Sep 19, 2014, 6:04 pm |
|
Post occupancy installation of photovoltaics as an appealNC-2009 EAc2: On-Site Renewable Energyposted by Kris Phillips on Feb 17, 2014, 2:33 pm
We have a project that may be 1 point short of the next level certification after its Construction Final Review and we have been asked to look at options to add a credit or two as an "appeal" to... Last reply: Marcus Sheffer, Aug 28, 2014, 7:36 pm |
|
Off-site PV array with PV DeveloperNC-2009 EAc2: On-Site Renewable Energyposted by Michael Pulaski on May 14, 2014, 4:43 pm
My university client is about to sign a letter of intent for a Net Metering Credit Purchase Agreement with a PV Developer for a 650 kW array. The land is located about a mile from the project... Last reply: Marcus Sheffer, Aug 26, 2014, 4:31 pm |