Forum » NC-2009 EAc1
Topic

Energy rate of DES Energy simulation

NC-2009 EAc1: Optimize Energy Performance
posted by Renaud Gay on Mar 19, 2015, 2:48 am

Hi Guys,
I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.
I did the energy modeling based...

Last reply: Marcus Sheffer, Mar 24, 2015, 12:27 pm

Interstitial or Interior Blinds

NC-2009 EAc1: Optimize Energy Performance
posted by Sandra Lester on Mar 14, 2015, 10:38 am

Would interstitial or interior blinds could contribute to load reductions and contribute to an increase in energy efficiency? What if the blinds are automated and these controls cannot be...

Last reply: Marcus Sheffer, Mar 16, 2015, 9:22 am

Laboratory 90.1 Modeling

NC-2009 EAc1: Optimize Energy Performance
posted by Victoria Watson on Dec 4, 2014, 11:23 am

Hi,
I am modeling a laboratory which has a small area of office space for LEED and wanted to check a couple of approaches:
1) The engineers have informed me that the lab has to be a...

Last reply: Marcus Sheffer, Mar 4, 2015, 2:52 pm

How does LEED view buildings designed per UFC?

NC-2009 EAc1: Optimize Energy Performance
posted by Kevin O'Brien on Apr 5, 2011, 2:51 pm

Can anyone advise how I should go about running the energy model for a building whose supply air & outside air quantities are being driven not by actual load, but by Unified facilities...

Last reply: Sara Zoumbaris, Mar 4, 2015, 1:41 pm

modeling VRF with DOAS

NC-2009 EAc1: Optimize Energy Performance
posted by Brian Thornton on Feb 17, 2015, 5:20 pm

Is there an accepted protocol for modeling in eQuest VRF systems with DOAS that does not require an exceptional calculation for seeking credit for EAc1? There are a variety of strategies that...

Last reply: Marcus Sheffer, Feb 24, 2015, 10:40 am

Scandinavian DES protocol

NC-2009 EAc1: Optimize Energy Performance
posted by Qian Tang on Oct 17, 2014, 10:38 am

Hello,
We are working on a LEED NC 2009 project in Germany with...

Last reply: Qian Tang, Feb 5, 2015, 3:30 am

DES Option 2 – CHP with absorption chiller

NC-2009 EAc1: Optimize Energy Performance
posted by Qian Tang on Jan 9, 2015, 4:10 am

Hello,
We are working on a LEED NC 2009 project with...

Last reply: Qian Tang, Feb 2, 2015, 5:47 am

Data Center in on Office building Energy Modelling Calculations

NC-2009 EAc1: Optimize Energy Performance
posted by ESRA OZKONUKSEVER on Dec 19, 2014, 8:38 am

Hi all,
We re currently working on an office building project of 10.000 square meters and within the building there is a data center as big as 150 square meters.
we are plannig to...

Last reply: ESRA OZKONUKSEVER, Jan 23, 2015, 9:36 am

Fenestration U-value: Framed versus Center-of-Glass

NC-2009 EAc1: Optimize Energy Performance
posted by Paul Cimaglia on Dec 10, 2014, 11:39 am

I received a review comment requesting confirmation that my modeled fenestration...

Last reply: Marcus Sheffer, Dec 10, 2014, 11:52 am

Car Park Ventilation Fan Energy Savings

NC-2009 EAc1: Optimize Energy Performance
posted by Chilufya Lombe on Nov 20, 2014, 8:10 am

Hi, on a recent project we were requested to provide evidence that 5 buildings built within the last three years did not have carbon monoxide sensors installed in the basement car parks in order...

Last reply: Marcus Sheffer, Nov 20, 2014, 10:35 am