Topic | Recent |
---|---|
MPR for adjacent buildingsNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Mar 1, 2013, 12:49 pm
LEED project boundary lines that “slice” through party walls must not pass through any MEP service infrastructure. Exceptions include buildings served by a common or shared chiller plant or... Last reply: Marcus Sheffer, Mar 4, 2013, 11:43 am |
|
Part of HVAC considered as Process for clean rooms?NC-2009 EAp2: Minimum Energy Performanceposted by Valentin Grimaud on Feb 28, 2013, 6:18 am
Dear community, My project includes extraordinary energy consumption for HVAC resulting from maintaining clean room environments – specifically the amount of air changes and pressure... Last reply: Marcus Sheffer, Mar 1, 2013, 2:18 pm |
|
Campus Energy SystemNC-2009 EAp2: Minimum Energy Performanceposted by Therese Malm on Feb 20, 2013, 5:06 am
Hi, We are working with a building in Norway that has a ground-source heat pump as its main heating system and it is also connected to communal district heating as a back-up. The Central... Last reply: Marcus Sheffer, Feb 28, 2013, 10:38 am |
|
Determining R-values for LEED wall assemblyNC-2009 EAp2: Minimum Energy Performanceposted by Todd Bundren on Feb 26, 2013, 3:53 pm
Is there a standard way the USGBC wants the R-value of a wall... Last reply: Marcus Sheffer, Feb 26, 2013, 4:44 pm |
|
Darkrooms LPD Space by Space MethodNC-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Feb 26, 2013, 9:17 am
We have a darkroom in a facility but Im not sure if it should be classified as active, inactive storage or other type of classification for the space by space method. Darkrooms are very specific... Last reply: Marcus Sheffer, Feb 26, 2013, 9:47 am |
|
Exterior lighting on building roof surfaceNC-2009 EAp2: Minimum Energy Performanceposted by Wei Jiang on Sep 3, 2012, 6:26 am
I'm working on a project with sitting areas and outdoor swimming pool on a building flat roof surface and installed with exterior lighting. ASHRAE 90.1 (Table 9.4.5) only covers the exterior... Last reply: Paula Hernandez, Feb 25, 2013, 12:59 pm |
|
Insufficient Cooling CapacityNC-2009 EAp2: Minimum Energy Performanceposted by Yoyo Shek on Feb 18, 2013, 8:39 pm
Dear All, Last reply: Yoyo Shek, Feb 21, 2013, 11:44 pm |
|
How to include Parking Ramp Energy Use in Small Bldg?NC-2009 EAp2: Minimum Energy Performanceposted by Kevin Flynn on Feb 21, 2013, 12:35 pm
I have just begun working on a project that features a small (under 20,000sf) office building on a large public plaza on top of a below grade parking ramp. Thus far, the team has assumed it... |
|
I am relatively new to LEEDNC-2009 EAp2: Minimum Energy Performanceposted by le sang on Feb 20, 2013, 9:38 am
I am relatively new to LEED and I would like to know if there are systems out there and gain many credits for a new office HQ in IrelandThe other question is related with how to prove a process... Last reply: Marcus Sheffer, Feb 21, 2013, 10:05 am |
|
minimum outdoor airNC-2009 EAp2: Minimum Energy Performanceposted by PAWAN DAHIWAL on Feb 20, 2013, 3:32 am
Minimum outdoor air shall be model identically in both the cases. I am confused which outdoor air should be taken from either from IEQ baseline or from actual. Last reply: Marcus Sheffer, Feb 20, 2013, 12:00 pm |