Is existing site lighting, scheduled to remain, required to be included in the Light Pollution Reduction Credit when using the calculation method or is it only for proposed light fixtures?
Thanks,
Forum discussion
NC-v4.1 SSc6:Light Pollution Reduction
Is existing site lighting, scheduled to remain, required to be included in the Light Pollution Reduction Credit when using the calculation method or is it only for proposed light fixtures?
Thanks,
LEEDuser is supported by our premium members, not by advertisers.
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Answer to your question can be found in the document "Model Lighting Ordinance User's Guide", available in the LEED Credit Library under Light Pollution Reduction -> Resources and Tipps :)