Spaces left for future use should be simulated as conditionned?NC-2009 EAp2: Minimum Energy Performanceposted by Valentin Grimaud on Apr 3, 2014, 12:39 pm
Dear community, I have a project where some spaces will be left for future use, while most of others are designed and built for immediate use. I am wondering if I must include them as... Last reply: Valentin Grimaud, Apr 4, 2014, 6:02 am |
|
District Thermal Energy and Single LEED project boundaryNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 3, 2014, 11:04 am
The project comprises four hospital buildings, called B, C, D and E, and each building is registered as an individual project on a campus basis. A chilled water plant, located at the roof of... Last reply: Marcus Sheffer, Apr 3, 2014, 11:16 am |
|
5 degree deadbandNC-2009 EAp2: Minimum Energy Performanceposted by Dave Hubka on Mar 18, 2014, 8:15 am
How is ASHRAE 6.4.3.1.2 5 degree deadband interpreted? 70-75 deadband provides six temperatures in which the thermostat is "dead". 70-74 deadband provides 5 temperatures in which the thermostat... Last reply: Marcus Sheffer, Mar 25, 2014, 11:22 am |
|
Hotel key tag systemNC-2009 EAp2: Minimum Energy Performanceposted by Nandana Kumar on Mar 25, 2014, 8:14 am
We are working on a hotel project. The guest rooms have a key tag system where the lights and AC switches off as soon as the guest removes the key from the key slot. Can we adopt exceptional... Last reply: Marcus Sheffer, Mar 25, 2014, 10:36 am |
|
Electric ShowerNC-2009 EAp2: Minimum Energy Performanceposted by SW LEE on Mar 9, 2014, 3:11 am
Our project is at South East Asia, do we need to comply to ASHRAE 90.1 on electric shower? Last reply: Marcus Sheffer, Mar 16, 2014, 4:09 pm |
|
Using a newer version of 90.1 than what LEED specifiesNC-2009 EAp2: Minimum Energy Performanceposted by Dave H on Feb 1, 2012, 9:53 am
I am working on a project that was registered under LEED NC 2.2. Will the USGBC allow us to apply requirements from 90.1 - 2010 to the project instead of 90.1 - 2004? Specifically what I am... Last reply: Marcus Sheffer, Mar 13, 2014, 9:22 am |
|
Baseline HVAC system for residential buildingNC-2009 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Mar 10, 2014, 1:23 pm
Hello, We are working on a residential project where the HVAC system won´t be provided for the apartments, the project scope contemplates the preparation and space for the equipments so... Last reply: Marcus Sheffer, Mar 12, 2014, 6:31 pm |
|
is this clarification ok?NC-2009 EAp2: Minimum Energy Performanceposted by Shenhao Li on Mar 11, 2014, 4:45 am
automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the... Last reply: Marcus Sheffer, Mar 11, 2014, 10:48 am |
|
24-hour lightingNC-2009 EAp2: Minimum Energy Performanceposted by Bill Swanson on Mar 10, 2014, 2:52 pm
I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect. The owner doesn't want these spaces to ever... Last reply: Marcus Sheffer, Mar 10, 2014, 3:05 pm |
|
EAp2 Labeling Mechanical EquipmentNC-2009 EAp2: Minimum Energy Performanceposted by Ian McCall on Mar 7, 2014, 1:03 pm
Hello, Last reply: Marcus Sheffer, Mar 7, 2014, 1:08 pm |