Topic | Recent |
---|---|
Low Impact Development and green infrastructure strategiesNC-2009 SSc6.1: Stormwater design - quantity controlposted by Alicia Freire on Jul 16, 2013, 6:52 am
Hello Last reply: Michael DeVuono, Jul 16, 2013, 12:12 pm |
|
unit (cf/storm)NC-2009 SSc6.1: Stormwater design - quantity controlposted by Ameet AA on Jun 18, 2013, 10:50 am
My project is using Option 1: Design stroms,Case 2 :Site with existing imperviousness mote than 50% LEED online template V 5.0 Table 6.1-3 Site runoff: Two year,24 hour Design storm... Last reply: Michael DeVuono, Jun 19, 2013, 8:06 am |
|
Option 1, Case 1, Stream Channel ProtectionNC-2009 SSc6.1: Stormwater design - quantity controlposted by Adi Negara, LEED AP BD+C on Jun 10, 2013, 11:58 pmthis, I would suggest you seek the assistance of a civil engineer or other qualified SWM professional, as the methodology for this is outside of the scope of this forum. Log in or register to post... Last reply: Michael DeVuono, Jun 13, 2013, 8:27 am |
|
Question about sizing the silt trapNC-2009 SSc6.1: Stormwater design - quantity controlposted by Magda Aghababyan on Jun 7, 2013, 2:50 am
Hi, We are trying to pursue both storm water quality control and quantity control credits. When we calculate the 2 year - 24 hour design storm it comes to about 6.75 inches and 25% of that we are... Last reply: Michael DeVuono, Jun 11, 2013, 10:29 am |
|
Rainfall Event IntervalNC-2009 SSc6.1: Stormwater design - quantity controlposted by Alicia Freire on May 20, 2013, 11:54 am
Hello, Last reply: Michael DeVuono, Jun 7, 2013, 9:24 am |
|
Design Respons from GBCI C6.1NC-2009 SSc6.1: Stormwater design - quantity controlposted by Veronika Sundberg on May 17, 2013, 7:56 am
Hej, Last reply: Michael DeVuono, May 24, 2013, 7:21 am |
|
Waiver for Quantity RequirementNC-2009 SSc6.1: Stormwater design - quantity controlposted by Tim Setala on May 1, 2013, 10:04 am
We have a project where... Last reply: Michael DeVuono, May 2, 2013, 1:26 pm |
|
Cistern volumeNC-2009 SSc6.1: Stormwater design - quantity controlposted by Lucie Cervena on Mar 18, 2013, 9:43 am
Could you please give me an advice regarding question 1? Our cistern is designed to store the volume that is required in this credit – the predevelopmet runoff is 90 m3, the post... Last reply: Michael DeVuono, Mar 21, 2013, 7:36 am |
|
Calculation of drawdown rate QrNC-2009 SSc6.1: Stormwater design - quantity controlposted by Christian Brücher on Jul 29, 2011, 6:54 am
I have a question for a Czech colleague of mine. The have a project and want to install a stormwater storage tank. The water shall be used for toilet flushing in the building. The problem is,... Last reply: Tristan Roberts, Mar 19, 2013, 9:19 am |
|
Computer-based software: Estimating SW runoff rates and volumes.NC-2009 SSc6.1: Stormwater design - quantity controlposted by Nadia Ayala on Mar 9, 2013, 7:02 pm
Hi everyone, Last reply: Michael DeVuono, Mar 11, 2013, 7:44 am |