Hi all,
Does anyone know if Product-specific Type III EPD in LEED V5 can be either internally reviewed or 3rd party verified to meet the baseline and hence one point (meeting the baseline) in Option 2 (Path 1: Project Average Approach) Materials and Resources Credit (MRc2) : REDUCE EMBODIED CARBON. Thanks