How is energy and waterconsumption data collected?

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Maria Perzon on Aug 27, 2018, 10:47 am

Hello,

Who (in the project organization) gets the notifications from USGBC to hand in the energy and water usage data (~Two times per year?)

Only total building energy and water...

Last reply: Michelle Reott, Aug 27, 2018, 1:39 pm

ENERGY STAR Portfolio Manager

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Gregory Martin on Aug 24, 2016, 4:14 pm

I am currently working on a template and it looks slightly different from the last project I worked on. There is no longer a specific option for ENERGY STAR Portfolio Manager, but I would assume...

Last reply: Sara Curlee, Jan 18, 2017, 12:07 pm

Applying for LEED after the building is finished

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Ciaran McCabe on Oct 6, 2016, 1:45 pm

This is a very general LEED question however is it possible to apply for LEED accreditation for a new building that is finished and handed over to client. Would we have missed out on the...

Last reply: Tristan Roberts, Jan 17, 2017, 4:49 pm

Reporting through Energy Star Portfolio Manager

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Claudia Galvis on Jul 26, 2016, 11:46 am

How often does the Owner need to report the Utility data if using the Energy Star Portfolio Manager to comply with MRP6? The form says on a 'regular basis', but does this mean monthly?

Last reply: Trista Little, Oct 5, 2016, 12:49 pm

Water meters to each tenant area.

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Ciaran McCabe on Sep 30, 2016, 5:41 am

I assume that waters are not required at each tenant level. Would one water meter for the building suffice the min requirements ?

Last reply: Trista Little, Oct 5, 2016, 12:46 pm

Building Metering and Utility Metering

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Becky Dix on May 9, 2014, 1:25 pm

On a higher ed project, there is proposed metering of all energy and water usage for the LEED building that can be read from the building automation system. Regarding the MPR 6 requirements, the...

Last reply: Melissa Kelly, Mar 1, 2016, 3:28 pm

Whole building Energy and Water Usage Data

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Terry Squyres on Jun 6, 2013, 11:42 am

I was wondering if somebody could help walk me through this aspect of PIf1. My project is a University building in which we will have limited monitoring. We are not going after measurement and...

Last reply: Trista Little, Feb 25, 2016, 3:04 pm

Energy and Water Data Reporting

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Yaneth Galindo on May 19, 2015, 2:20 pm

I registered the project in the Energy Start Portfolio website, but I realized the meter I subscribe is for more than one building, I have now water and electrical submeters and I would like to...

Last reply: Trista Little, Feb 25, 2016, 2:38 pm

Campus Project

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by P Fanfulik on Jan 27, 2015, 10:48 am

I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus? The parent/child property is very...

Last reply: Trista Little, Feb 25, 2016, 2:23 pm

Is data being gathered and used?

NC-2009 MPR6: Must commit to sharing whole-building energy and water usage data
posted by Bill Swanson on Jan 22, 2013, 2:25 pm

We commit to allowing USGBC to have access to our energy and water meter data from the Utilities. Does USGBC follow up and collect this building data for all v2009 projects?

Last reply: Trista Little, Feb 25, 2016, 2:12 pm