Energy Rates for CHP used Project

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener

5
Mon Jun 26, 2017, 1:24 pm

Project with no off-street parking spaces

ND-Plan-v4 NPDc5:Reduced parking footprint
posted by  Noriko Nagazumi  on 

Hi, Our project has no off-street parking spaces.

9
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Jun 26, 2017, 4:41 am

Modeling Limitations to the Simulation Program

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Vasileios Kalfountzos  on 

I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13. "If the simulation program cannot model a component

2
Thu Jun 22, 2017, 1:17 pm

Controllability of lighting in Shared Area

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jonathan Mak  on 

We are having a hotel project that would like to attempt this credit.

2
Thu Jun 22, 2017, 6:14 am

Baseline Hot water pump power for Purchased heat

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling follows LEDD v3 - 2007 (System 7) and the heating source is purchased heat. There are two question related to this issue. 1.

3
Default Avatar
Vice President / Principal
2rw Consultants, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Jun 21, 2017, 7:54 pm

Reduced Truck Idling

Warehouses-NC-v4 LTc8:Green vehicles
posted by  Michelle Rosenberger  on 

Okay first up, I'm confused. The Birds Eye Language above is for the regular New Construction options, not for the Warehouses and Distribution options.

2
Default Avatar
Sustainability Coordinator
DES Architects + Engineers
LEEDuser Basic Member
5 thumbs up
Wed Jun 21, 2017, 5:09 pm

Existing Landscape Area

ND-Plan-v4 GIBc4:Outdoor water use reduction
posted by  Noriko Nagazumi  on 

Hi, Our project has a portion of existing landscaped area within the project boundary.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Jun 21, 2017, 8:38 am

Where did my ID credits go?

Navigating LEED Online
posted by  Deborah Lucking  on 
Well, yes, the Credit Category is still there, as are IDc1.1, 1.2, etc. But the ability to change the name to a specific credit has disappeared.
12
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Jun 20, 2017, 10:27 pm

Peak building users (FTE + Peak Transients)

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sara Johansson  on 

I am working on a LEED v.2009 CS project, using deafault occupancy Core and Shell Appendix 1. I assume that FTE and transients here are average transients?

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Jun 20, 2017, 10:25 am

Changing Facilities

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sara Johansson  on 

I am working on a LEED CS v.2009 project greater than 300 000 sf. In the LEED Online form I have to fill out number of changing facilities and number of showers.

3
LEED® AP O+M
Skanska Sverige AB
LEEDuser Basic Member
2 thumbs up