Uploading Results from Waste Audit into ArcEBOM-v4.1 MRp3: Waste Performanceposted by Kristina K on Mar 18, 2025, 1:57 pm
Hello, Our project completed a waste audit over a 24-hour period and the data was extrapolated to represent the whole year - the one year data was entered into Arc accordingly for the... |
|
Waste performance yields a score of zero points in ARCEBOM-v4.1 MRp3: Waste Performanceposted by jimmy Adames on Feb 26, 2024, 1:50 pm
Hi, Our building is a very automated distribution center for an apparel company. Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, all... Last reply: Alexandra Popp, Aug 5, 2024, 3:10 pm |
|
"Total waste" for warehouse/distribution, occupant waste only?EBOM-v4.1 MRp3: Waste Performanceposted by Kristina K on Apr 28, 2021, 9:51 am
Hello, To our understanding, the waste score is generated through Arc by the weight generated per person. For warehouse projects, the operations/processes itself will generate a great... Last reply: Jenni Betancourt, Jul 23, 2024, 10:31 am |
|
Inclusion of Process Waste in Waste Performance CalculationEBOM-v4.1 MRp3: Waste Performanceposted by Subhashkumar A on Mar 16, 2024, 6:44 am
Hello, Our project building is a garment building, and its final product is dresses. It generates fabric waste during the production process, inherent to the nature of the production... |
|
TRUE Waste Certification Advisor RecommendationEBOM-v4.1 MRp3: Waste Performanceposted by Daniel Bertschinger on Mar 13, 2024, 3:32 pm
Hello Everyone! |
|
Reuseable FiltersEBOM-v4.1 MRp3: Waste Performanceposted by Simon Turner on Oct 17, 2023, 1:35 pm
A company called K&N is manufacturing HVAC filters which have a minimum 15 year lifespan - they are washed out when they load up, rather than disposed of in landfills. Has anyone used these... |
|
Gather one year waste data or do a waste analysis/audit?EBOM-v4.1 MRp3: Waste Performanceposted by shashank gangil on Sep 16, 2022, 8:56 pm
Dear, The language of LEED V4.1 says that project either collect one year waste data or waste analysis. Does it means, the waste analysis is an audit which can be done based on less then 1... Last reply: Randi B., Jul 19, 2023, 8:36 pm |
|
Restaurant on ground floor of buildingEBOM-v4.1 MRp3: Waste Performanceposted by Sareet Benayahu on Apr 27, 2023, 7:18 am
Hello, we are doing an ... Last reply: Ana Lucia Granda, Jun 13, 2023, 4:11 pm |
|
Waste ScoreEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Apr 7, 2023, 3:59 am
Is there a reference or a list showing the waste score for the baseline buildings? Can a project predict what percentage of... |
|
Commingled Waste approach in storage locations for recyclable materialsEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am
I'm working on a huge existing Mall, Is the... |