Forum quick links
LEED CI V4 Tenant space modeling interpretation
CI-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello,
Contracted Waste and Recycling Service
CI-v4 MRp1:Storage and collection of recyclablesposted by Summer Minchew on
I have a LEED CI project in a building whose contracted waste service does not provide glass recycling due to "depressed markets" and provides single-stream waste and recycling pickup.
Fire Proofing for the Building Structure
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Ali Soufan on
The building is steel structure, which will be painted with fire rated paint.
Which Option 2 strategies for a warehouse hall?
Warehouses-NC-v4 EQc6:Interior lightingposted by Frantisek Macholda on
Hello,
Looking for great stories- Can I share your project at AIA '18?
posted by Gina Bocra on
Happy Thursday, all!
Long-term vs. Short-term and combining the two
Healthcare-v4 LTc6:Bicycle facilitiesposted by Hannah Walter on
It seems like it would be, but it's not really clear...can long-term and short-term bicycle storage be in the same location. So say 4 short-term spaces are required per the calculations, and
Survey from UC Berkeley on changing climate informing design
posted by Z Smith on
The Center for the Built Environment (CBE) at the University of California, Berkeley is conducting a survey to understand current practices and outlooks among design practitioners: architects, engi
Tenant Terrace
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Ilana Judah on
Are doors to an upper floor roof terrace of a tenant office space considered a regularly used exterior entrance requiring an entryway system?
HVAC System Selection
NC-v4 IPc1:Integrative processposted by Dave Hubka on
It doesn't seem like the credit requires evaluation of various HVAC systems (e.g. radiant heat vs forced air heat, packaged cooling vs split systems, etc.).