Log in
LEED v2009
Schools
Minimum Program Requirements
Must be a complete, permanent building or space

LEED CREDIT

Schools-2009 MPR2: Must be a complete, permanent building or space Required

See all forum discussions about this credit »

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

All rating systems
All LEED projects must be designed for, constructed on, and operated on a permanent location on already existing land. LEED projects shall not consist of mobile structures, equipment, or vehicles. No building or space that is designed to move at any point in its lifetime may pursue LEED Certification.
New Construction, Core & Shell, Schools, Retail – New Construction, Healthcare
LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high-rise residential building in its entirety.
Commercial Interiors, Retail – Commercial Interiors
The LEED project scope must include a complete interior space distinct from other spaces within the same building with regards to at least one of the following characteristics: ownership, management, lease, or party wall separation.
Existing Buildings: O&M
LEED projects must include at least one existing commercial, institutional, or high-rise residential building in its entirety. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

All rating systems
All LEED projects must be designed for, constructed on, and operated on a permanent location on already existing land. LEED projects shall not consist of mobile structures, equipment, or vehicles. No building or space that is designed to move at any point in its lifetime may pursue LEED Certification.
New Construction, Core & Shell, Schools, Retail – New Construction, Healthcare
LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high-rise residential building in its entirety.
Commercial Interiors, Retail – Commercial Interiors
The LEED project scope must include a complete interior space distinct from other spaces within the same building with regards to at least one of the following characteristics: ownership, management, lease, or party wall separation.
Existing Buildings: O&M
LEED projects must include at least one existing commercial, institutional, or high-rise residential building in its entirety.

LEEDuser expert

Tristan Roberts

LEED AP BD+C, LFA

Vermont House of Representatives
Representative

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Schools-2009 MPR2