Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Ergonomics approach for computer users

Retail-CI-v4 INc1:Innovation
posted by  Anna Scade  on 

I am attempting the Ergonomics approach for computer users Pilot credit and I am confused about what exactly needs to be provided to confirm that an Ergonomist or Health and Safety Specialist was u

1
Fri Feb 10, 2023, 5:09 pm

social equity within the supply chain

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Dennis Daniel  on 

We supply floor covering for LEED v.4 projects. The company I work for has a Code of Conduct that is based on the 10 Principles  of the UN Global Compact.

1
Fri Oct 26, 2018, 3:42 pm

Gross Floor area Question

CI-v4 EQc4:Indoor air quality assessment
posted by  Nancy Henderson  on 

We have a tenant with several full floors being built out in a new core and shell building.  Does the gross SF for the purpose of the flush out need to include what would be considered core sp

1
Thu Oct 25, 2018, 6:45 pm

Forum moderation questions and feature requests

BITuser
posted by  Dennis Palko  on 
  1. How can an Editor delete, hide or updated posts that others create.  We need to take down some of the test posts but there may be cases where something posted is incorrect or not approp
6
Default Avatar
Senior Technical Project Manager, Finance & Operations | Salesforce Administrator
Southface
LEEDuser Premium Member
0 thumbs up
Thu Oct 25, 2018, 2:58 pm

Membrane Primer VOC – LEED V4 – Healthcare

Healthcare-v4 EQc2:Low emitting materials
posted by  Rebecca Barr  on 

Hi there, we are a fabricator and installer of architectural metal wall panel systems and I was looking for some insight into VOC levels and air and vapour membrane adhesive.  We typically use

0

Select system for the Baseline building according ASHRAE 90.1 -2010 - Proposed wiht Heat pump

NC-v4 EAc2:Optimize energy performance
posted by  Konstantina Kalliakoudi  on 

Hello,

I have following questioning:

My proposed building is nonresidential 710.000 ft2 and the Heating/ Cooling production is made with Chillers and Heat pumps.

1
Fri Oct 26, 2018, 4:20 pm

OPR and BOD documents

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Carlos Vazquez  on 

I accepted an assignment of commissioning a 3,400 sq-ft project to apply for a LEED certification. I came in late in the game.

5
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Oct 24, 2018, 8:17 pm

Advocate for PACE financing in NYC

Green Commons
posted by  Chris Garvin  on 

Sustainable Design Leaders in NYC

1
Wed Oct 24, 2018, 8:10 pm

Chilled Water vs DX System 5 is currently flawed.

NC-v4 EAp2:Minimum energy performance
posted by  Alejandro Vera  on 

At issue, our proposed system (chilled water) is paired against a System 5 (non-residental < 5 floors & 25,000 < SQFT < 150,000) but we are having a problem with the energy modeling wh

3
Default Avatar
Mechanical Designer
20/10 Engineering Group
LEEDuser Basic Member
0 thumbs up
Wed Oct 24, 2018, 7:14 pm