Forum discussion

NC-v4 EQc6:Interior lighting

Strategies F and G

Hello,

1) When persuing strategy G by measuring iluminance with a light meter after construction, is there any specific procedure that must be followed? For example, when measuring illuminance of a wall, how many measurements must be made and in what conditions (with or without daylight)? Where in the wall must the measurements be made (work surface level / ground level, etc...)? Is there a guide to help?

2) In strategy F, what does LEED mean by "Movable partitions"?

Thank you in advance!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 11/20/2018 - 20:20

Luis, have you checked the reference guide for question #1? There are fairly extensive instructions and calculations, but I'm not sure if you need guidance beyond that. Movable partitions are sectional walls that can be moved around easily to reconfigure a space.

Wed, 11/21/2018 - 10:28

Hi Paula, thanks for your response! Yes, I've read the Reference Guide and I belive that I understood the instructions. Howerver, there could be a referenced procedure to make the measurements... But we're making arrangements to performe those measurements based on the RG v4. Thank you!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.