Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Limits for VOC content outside US, additional questions

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Ernst Schriefl  on 

All the limits on VOC content provided in the LEED reference guide (2009 edition) are minus water (g/L minus water or g/L less water).

0

Determing VOC content outside of US

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Ernst Schriefl  on 

Yesterday we had a conversation with a US manufacturer who told us that the VOC content outside the US can also be determined according to the respective national requirements.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Apr 17, 2019, 3:42 pm

Healthcare-v4.1 MRc5 - PBT Source Reduction - Mercury - Credit form

Healthcare-v4.1 MRc5:PBT Source Reduction - Mercury
posted by  Don Jones  on 

Our major renovation project will use NO mercury containing lighting or devices.

1. Is there a template for this credit?

0

SCL Demographics Survey Results!

SC Leaders
posted by  RoseAnn Grimes  on 

Hello Everyone,

0

Submitting a credit during the review process which was not submitted at first application

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ernst Schriefl  on 

I have a general question regarding the review process:

Say, you have already submitted a certain amount of credits for review and received a preliminary review.

1
Wed Apr 17, 2019, 3:16 pm

Barriers in implementing material transparency in LEED v4 projects

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  SUSAN THOMAS  on 

I am a master's student at State University of New York College of Environmental Science and Forestry doing my thesis in Barriers in implementing material transparency in LEED v4 projects.

0

Shading by fixed construction elements - take into account for the baseline model?

NC-v4 EAc2:Optimize energy performance
posted by  Sarah Leenknegt  on 

Hi

Summary from Appendix G:

- self-shading is not allowed to be modeled in the baseline

- manual shading devices are not required to be modeled in the baseline

1
Tue Apr 16, 2019, 4:12 pm

Material costs necessary?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Tommy Linstroth  on 

For EPD Option 1 or MIR Option 1, it would seem you can just submit 20+ products with EPDs and not have to provide any material cost data whatsoever in the BPDO calculator, since the cost calculati

6
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Apr 16, 2019, 1:07 pm